Orange County NC Website
17 <br /> <br />• Sportsplex Proprietary Projects (FY 2018-19): 1 <br />Equipment, Repairs, and Improvements - $507,000 (pages 87-94) 2 <br />Discussion will also be directed to recommended Future Capital Projects in Years 2-5 of the 3 <br />CIP (FY 2019-20 through FY 2022-23); the Water and Sewer Debt Service requirements paid 4 <br />with Article 46 Quarter Cent Sales Tax proceeds (page 177), and Debt 5 <br /> 6 <br />Service requirements for Solid Waste (page 178) and Sportsplex (page 179). 7 <br /> 8 <br />Sportsplex - New Facilities 9 <br />Project Description/Justification: Funding in FY 2018-19 of $65,000 includes an elevated 10 <br />enclosed connecting ramp between the Sportsplex and Field House. Prior Years funding 11 <br />includes the Field House Complex featuring a Sports and Recreation section, Camp, After and 12 <br />Pre-School area and Fitness section, for total funding of $3,997,000, $222,000 in reallocated 13 <br />funding from previously unused project funds for a Family/Single User Change Room project, 14 <br />and $125,000 in reallocated unused capital funds for storage space. Year 1 Operating costs 15 <br />reflect a half year of operation with the overall project costs recovered from net operating 16 <br />revenues over a six year period. Years 6-10 includes new member change area to 17 <br />accommodate growth plus the need to segregate the youth and adult user segments currently 18 <br />using the combined pool/member change areas; and enclosing the outdoor turf field to expand 19 <br />revenue generating programs. 20 <br /> 21 <br />Sportsplex - Facilities Maintenance/Replacement 22 <br />Project Description/Justification: Funding in FY 2018-19 includes $85,000 to replace HVAC 23 <br />equipment that has reached or exceeded its life expectancy and $20,000 for replacement 24 <br />exterior and interior access including automatic ADA door openers. In 2019-20 all remaining 25 <br />access doors will be upgraded. Funding in FY 2020-21 includes $200,000 for an upgrade to a 26 <br />high efficiency utility management system, which is projected to save $40,000 annually in utility 27 <br />costs. Funding in FY 2021-22 totals $225,000 for additional parking lot repair/repaving in areas 28 <br />not included in the prior years funding, and scheduled replacement of HVAC equipment and 29 <br />IT/Communications/Security equipment replacement. 30 <br /> 31 <br />Sportsplex - Kidsplex 32 <br />Project Description/Justification: Funding in FY2017-18 was authorized for additional Kidsplex 33 <br />equipment to accommodate the growth in Kidsplex programs. Funding in FY 2018-19 and FY 34 <br />2019-20 includes $30,000 for additional purchase of inflatables, to be positioned in space 35 <br />created by the Field House project. Funding in FY 2021-22 includes $105,000 for additional 36 <br />and/or replacement Kidsplex equipment, as well as inflatables. 37 <br /> 38 <br />John Stock, Sportsplex Executive Director, reviewed the following information: 39 <br /> 40 <br />Sportsplex - Ice Rink 41 <br />Project Description/Justification: Funding in FY2018-19 includes $100,000 for major rebuild of 42 <br />compressors and chiller barrel. Funding in FY 2019-20 includes $125,000 for replacement of 43 <br />rink de-humidification unit. Funding in FY 2020- 21 includes $975,000 for ice rink re-build. In 44 <br />2020, the rink will be 25 years old and is at its life expectancy. The re-build is planned to 45 <br />protect this significant source of annual income to the Sportsplex Fund. FY 2020-21 also 46 <br />includes renovations to the ice rink locker areas, rubberized flooring, and plexi-glass. 47 <br /> 48 <br />Sportsplex – Fitness 49