Attachment 1
<br />Orange County Recommendations for Ranking Projects within TARPO and Map
<br />N/A - Not Applicable, as not on the County's list of priority projects. If left unranked by Orange County, no TARPO local input points will be assigned to these NC -54 projects
<br />Cost determined by NCDOT Feasibility Studies Unit using their Cost Estimation Tool.
<br />1- Modernization projects typically include:
<br />• Improving roadway geometry for motorist (recovery area) and bicyclists (additional room on paved shoulder) safety.
<br />• Bringing groadway up to current standards by increasing lane and pavement width without adding additional lanes.
<br />• Adding turn lanes at multiple intersections along section of roadway.
<br />OUTBoard
<br />Map
<br />Mode
<br />Tier
<br />Description
<br />Total Cost
<br />Submitted By
<br />Ranking
<br />Construction Cost
<br />Right -of -Way Cost
<br />Utilities Cost
<br />Actual Project Cost
<br />Reference
<br />(April 18, 2018)
<br />1
<br />Transit
<br />Division
<br />Orange Public Transit - Purchase two light transit
<br />$ 108,400
<br />TARPO
<br />1
<br />$ 108,400
<br />vehicles.
<br />SR 1005 (Old Greensboro Rd) from SR 1942 (Jones Ferry
<br />2
<br />Highway
<br />Division
<br />Rd) to NC 87 in Alamance County - Modernize' and add
<br />$ 42,500,000
<br />TARPO
<br />2
<br />$ 35,000,000
<br />$ 6,000,000
<br />$ 1,500,000
<br />$ 42,500,000
<br />4- foot paved shoulders.
<br />SR 1004/1357 (Efland -Cedar Grove Road) from SR 1332
<br />3
<br />Highway
<br />Division
<br />(Highland Farm Rd) to NC 86 - Modernization', including
<br />$ 17,500,000
<br />TARPO
<br />3
<br />$ 15,000,000
<br />$ 2,000,000
<br />$ 500,000
<br />$ 17,500,000
<br />turn lanes where appropriate, and addition of 4 -foot
<br />paved shoulders.
<br />NC 54 from SR 1006 (Orange Grove Rd) to SR
<br />A
<br />Highway
<br />Regional
<br />1937/1107 (Old Fayetteville Rd) - Widen to a four -lane
<br />$ 83,000,000
<br />Carryover
<br />N/A
<br />$ 55,500,000
<br />$ 24,500,000
<br />$ 3,000,000
<br />$ 83,000,000
<br />boulevard.
<br />NC 54 from NC 119 to Orange Grove Rd - Widen
<br />8
<br />Highway
<br />Regional
<br />roadway from two -lane undivided to four -lane divided
<br />$ 107,600,000
<br />BGMPO
<br />N/A
<br />$ 79,000,000
<br />$ 25,500,000
<br />$ 3,100,000
<br />$ 107,600,000
<br />roadway.
<br />N/A - Not Applicable, as not on the County's list of priority projects. If left unranked by Orange County, no TARPO local input points will be assigned to these NC -54 projects
<br />Cost determined by NCDOT Feasibility Studies Unit using their Cost Estimation Tool.
<br />1- Modernization projects typically include:
<br />• Improving roadway geometry for motorist (recovery area) and bicyclists (additional room on paved shoulder) safety.
<br />• Bringing groadway up to current standards by increasing lane and pavement width without adding additional lanes.
<br />• Adding turn lanes at multiple intersections along section of roadway.
<br />
|