Orange County NC Website
Attachment 1 <br />Orange County Recommendations for Ranking Projects within TARPO and Map <br />N/A - Not Applicable, as not on the County's list of priority projects. If left unranked by Orange County, no TARPO local input points will be assigned to these NC -54 projects <br />Cost determined by NCDOT Feasibility Studies Unit using their Cost Estimation Tool. <br />1- Modernization projects typically include: <br />• Improving roadway geometry for motorist (recovery area) and bicyclists (additional room on paved shoulder) safety. <br />• Bringing groadway up to current standards by increasing lane and pavement width without adding additional lanes. <br />• Adding turn lanes at multiple intersections along section of roadway. <br />OUTBoard <br />Map <br />Mode <br />Tier <br />Description <br />Total Cost <br />Submitted By <br />Ranking <br />Construction Cost <br />Right -of -Way Cost <br />Utilities Cost <br />Actual Project Cost <br />Reference <br />(April 18, 2018) <br />1 <br />Transit <br />Division <br />Orange Public Transit - Purchase two light transit <br />$ 108,400 <br />TARPO <br />1 <br />$ 108,400 <br />vehicles. <br />SR 1005 (Old Greensboro Rd) from SR 1942 (Jones Ferry <br />2 <br />Highway <br />Division <br />Rd) to NC 87 in Alamance County - Modernize' and add <br />$ 42,500,000 <br />TARPO <br />2 <br />$ 35,000,000 <br />$ 6,000,000 <br />$ 1,500,000 <br />$ 42,500,000 <br />4- foot paved shoulders. <br />SR 1004/1357 (Efland -Cedar Grove Road) from SR 1332 <br />3 <br />Highway <br />Division <br />(Highland Farm Rd) to NC 86 - Modernization', including <br />$ 17,500,000 <br />TARPO <br />3 <br />$ 15,000,000 <br />$ 2,000,000 <br />$ 500,000 <br />$ 17,500,000 <br />turn lanes where appropriate, and addition of 4 -foot <br />paved shoulders. <br />NC 54 from SR 1006 (Orange Grove Rd) to SR <br />A <br />Highway <br />Regional <br />1937/1107 (Old Fayetteville Rd) - Widen to a four -lane <br />$ 83,000,000 <br />Carryover <br />N/A <br />$ 55,500,000 <br />$ 24,500,000 <br />$ 3,000,000 <br />$ 83,000,000 <br />boulevard. <br />NC 54 from NC 119 to Orange Grove Rd - Widen <br />8 <br />Highway <br />Regional <br />roadway from two -lane undivided to four -lane divided <br />$ 107,600,000 <br />BGMPO <br />N/A <br />$ 79,000,000 <br />$ 25,500,000 <br />$ 3,100,000 <br />$ 107,600,000 <br />roadway. <br />N/A - Not Applicable, as not on the County's list of priority projects. If left unranked by Orange County, no TARPO local input points will be assigned to these NC -54 projects <br />Cost determined by NCDOT Feasibility Studies Unit using their Cost Estimation Tool. <br />1- Modernization projects typically include: <br />• Improving roadway geometry for motorist (recovery area) and bicyclists (additional room on paved shoulder) safety. <br />• Bringing groadway up to current standards by increasing lane and pavement width without adding additional lanes. <br />• Adding turn lanes at multiple intersections along section of roadway. <br />