Browse
Search
Agenda 8-a - Minutes
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2018
>
Agenda - 05-01-2018
>
Agenda 8-a - Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2018 2:27:40 PM
Creation date
4/26/2018 2:26:36 PM
Metadata
Fields
Template:
BOCC
Document Relationships
Agenda - 05-01-2018
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2018\Agenda - 05-01-2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
18 <br /> <br />Project Description/Justification: Funding in FY 2018-19, FY 2020-21, and FY 2022-23 1 <br />includes $100,000 in each fiscal year for replacement and upgrades of fitness equipment. 2 <br />Based on industry standards, heavy use commercial cardio equipment has a useful life of 3 <br />approximately 3 years. 4 <br /> 5 <br />Sportsplex – Pool 6 <br />Project Description/Justification: Funding in FY 2018-19 includes $20,000 for a comprehensive 7 <br />Natatorium study (re-allocated from a project funded from operations) as well as $80,000 as a 8 <br />contingency to replace the compressors on one of the two major pool HVAC systems that are 9 <br />experiencing premature end of life failure. Funding in FY 2018-19 also includes $12,000 for 10 <br />handicap pool lifts to complement the handicap ramp currently in place as a result of more 11 <br />users with disabilities using both pools. Funding in FY 2019-20 includes $50,000 for boilers 12 <br />and pumps repair/replacement, and FY 2021-22 includes a total of $90,000 for replacement 13 <br />and upgrade of the pool lane timer/scoreboard, additional boiler and pumps 14 <br />repair/replacement, and repairs to the pool plaster and tile. Years 6-10 includes contingency 15 <br />funding based on the results of the Natatorium study related to the pool HVAC systems. 16 <br /> 17 <br />John Stock gave an update on the field house construction. 18 <br />Commissioner McKee thanked John Stock for the handicapped ramp and lifts with the 19 <br />pool. 20 <br />John Stock said one can never give too much support to the handicapped community. 21 <br />He said automatic accessible doors are being looked into at this time, to allow for a longer 22 <br />delay before the doors close. 23 <br />Commissioner McKee said he expects usage to continue to grow. 24 <br />John Stock said 46% of the Sportsplex members are over 55 years of age. 25 <br /> 26 <br />FY2018-23 Recommended Capital Investment Plan 27 <br />Sportsplex 28 <br />• Sportsplex Projects $507,000 (p. 87) 29 <br />o Elevated Connector from Sportxplex to Fieldhouse - $65,000 30 <br />o Heating, Ventilation, and Air Conditioning - $85,000 31 <br />o Access Doors - $20,000 32 <br />o Kidsplex Inflatables - $25,000 33 <br />o Ice Rink Rebuild of Compressor and Chiller Barrel - $100,000 34 <br />o Fitness Equipment - $100,000 35 <br />o Pool Equipment Replacement - $80,000 36 <br />o Natatorium Engineering Study - $20,000 37 <br />o Handicap Pool Lifts - $12,000 38 <br /> 39 <br />Travis Myren resumed the presentation: 40 <br /> 41 <br />• Economic Development (Water and Sewer) - $145,000 (page 75) 42 <br /> Project Description/Justification: Recent developer interest in this area of the County has 43 <br />created the need to accelerate the capacity expansion of the Gravelly Hill pump station, 44 <br />utilizing the capacity of the Efland Sewer to Mebane, Phase 2 Extension. $1,510,000 of 45 <br />funding for design, construction and project management for Phase 3 has been advanced 46 <br />accordingly. Phase 3 includes an upgrade to a lift station and connection to a different force 47 <br />main. The project will extend under the interstate to the D3 area to the north as shown on the 48 <br />project map from prior work in Phase 2. This 200+ acre area of the County has been 49 <br />designated an Economic Development District and is one of the few areas with rail access. 50
The URL can be used to link to this page
Your browser does not support the video tag.