Orange County NC Website
3. Continue to coordinate with the Orange County Department of Aging Mobility <br />Manager on implementation efforts of the Master Aging Plan Transportation <br />Goals. <br />4. Review, comment and make recommendations on the NC Hwy 54 feasibility <br />study being in DCHC MPO, TARPO and B -G MPO jurisdictions. <br />5. Review, comment and make recommendations on the B -G MPO CTP/ MTP. <br />6. Review, comment and make recommendations on the TARPO CTP: <br />a. Change the CTP designation on NC Hwy 86 from "Expressway Needs <br />Improvement" to "Major Thoroughfare Existing ", <br />b. Add recommendations from NC -54 Corridor Study <br />c. Bike /Ped connection on Old NC -86 between Hillsborough and Carrboro. <br />7. In 2018 B -G MPO will be coordinating with NCDOT /NCAMPO on projects and <br />programs that support the use of alternative fuels, electric and <br />autonomous /connected vehicles. The OUTBoard may be required to review, <br />comment and make recommendations on these projects. <br />8. If referred by the BOCC: Implementation efforts related to the Safe Routes to <br />School (SRTS) Action Plan <br />45 <br />