Orange County NC Website
B. STATE PERMITS REQUIRED <br />1. Does the project involve the mining of earth products? <br />rJ° <br />ff so, how many cubic feet of material are expected to be <br />excavated? /' M <br />Has an application for a Mining Permit been submitted to <br />NCDRCD? 1i /A- <br />Please attach map indicating expected extent of proposed activity. <br />2. Does the project involve generation or storage of hazardous or <br />toxic wastes, as identified by the Environmental Protection <br />Agency? (A listing of all hazardous materials is available from the <br />Planning Department) /"'b <br />Describe the wastes to be generated, /111191- <br />How much material is expected to be generated per month? <br />AIM- <br />Will any material be treated onsde? /it) <br />Volume? <br />Will any material be stored onside? 4/6 <br />Volume? <br />Where will disposal of the material take place? <br />/i �F9" -- <br />How will materials be transported to the disposal site? <br />What measures are proposed to protect water quality and air <br />quality in case of spills? 1-114_ <br />51 I <br />