Browse
Search
Agenda - 02-08-2005-2a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2005
>
Agenda - 02-08-2005
>
Agenda - 02-08-2005-2a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 9:27:41 PM
Creation date
8/29/2008 10:04:34 AM
Metadata
Fields
Template:
BOCC
Date
2/8/2005
Document Type
Agenda
Agenda Item
2a
Document Relationships
Minutes - 20050208
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br />Orange County Comprehensive Plan, components of the Recreation and Parks Strategic Plan <br />document, i.e., the citizen survey, will likely be incorporated as features. Staff believes that the <br />two processes should dovetail nicely given the continuum of responsibilities between ERCD and <br />Recreation and Parks. <br />Facilities planned and funded for development, or "On the Horizon", such as Twin Creeks <br />(Phase One), are those requiring immediate attention in planning for their operational needs. <br />Those planned conceptually on land owned and designated by the County for parks or <br />preserves, but not yet funded for development, present more difficulties in accurate financial <br />planning, as so many uncertainties exist in the components to be included in the project. <br />Projected requirements for some of these sites are based on expectations of what might be <br />included in the final design, and not on decisions already made or direction established by the <br />Board. <br />Foremost among the themes of discussion in drafting the Strategic Plan has been the overall <br />cost associated with the projected needs outlined. Work is presently underway to study <br />opportunities for the contracting of services. In some areas of operation, a contractual <br />arrangement may prove to be both practical and cost effective, while in other areas, little <br />savings may be realized or the idea might not be otherwise practical. A future draft of the plan <br />will attempt to present details of such proposed arrangements for the Committee's <br />consideration. <br />Another theme of discussion centered on the concept of "fixed" versus "mobile" crews. A map <br />showing Orange County Parkland and the type of crew and equipment proposed for each site <br />was developed and reviewed by the Committee. This map is included in the draft plan as <br />Appendix J. <br />The full list of comments and questions of the Committee have been summarized, along with <br />responses and information added to the plan or in progress. These meeting summaries are <br />included inside the front cover of the draft plan notebook (Attachment B). <br />The full Committee has met to discuss the plan on two occasions: December 2, 2004 and <br />January 11, 2005. At the January 11 meeting, it was agreed that the draft Strategic Plan <br />(Attachment A) was at a stage where it could be presented to the full Board of County <br />Commissioners for consideration and to receive further direction before continuing to develop <br />the plan. The draft plan, while not complete, does identify the need for at least the one position <br />given current operational expectations. Members of the Committee agreed that it would be <br />reasonable for the Board to consider this position request at this time, as it is one of the first <br />steps outlined in the plan. <br />FINANCIAL IMPACT: The proposed Strategic Plan is a "working" document or "draft" at this <br />stage. It is an effort to forecast the resources that staff believes would be needed to operate <br />and maintain new park facilities from year to year as they come on line. It is not intended to <br />reflect a commitment or obligation by the Board to a certain resource level. Staff is aware that <br />implementation of any plan would proceed within the timelines and parameters of future funding <br />decisions made by the Board. <br />The Board did elect to reserve funding in this fiscal year for the addition of a Parks Conservation <br />Technical II to perform routine maintenance, conservation, and operational functions for parks <br />facilities such as athletic fields, ball courts, picnic shelters, play structures, natural areas, and
The URL can be used to link to this page
Your browser does not support the video tag.