Browse
Search
2018-125-E Planning - Transstate LLC Phase 3+5 Sewer Cleaning
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-125-E Planning - Transstate LLC Phase 3+5 Sewer Cleaning
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2018 4:47:04 PM
Creation date
4/23/2018 1:52:51 PM
Metadata
Fields
Template:
Contract
Date
4/16/2018
Contract Starting Date
4/16/2018
Contract Ending Date
6/30/2018
Contract Document Type
Agreement - Services
Amount
$39,600.00
Document Relationships
R 2018-125 Planning - Transstate LLC SewerCleaning
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 6E30952E- 74C9- 4C59- B050- B1AE415FDFED <br />[Departmental Use Only] <br />TITLE PH3&5SewerC lean ing <br />FY 17 -18 <br />NORTH CAROLINA <br />SERVICES AGREEMENT UNDER $90,000.00 <br />RFP <br />ORANGE COUNTY <br />This Services Agreement (hereinafter "Agreement "), made and entered into this 16th day of <br />April, 2018, ( "Effective Date ") by and between Orange County, North Carolina a political <br />subdivision of the State of North Carolina (hereinafter, the "County ") and Transstate, LLC, <br />(hereinafter, the "Provider "). <br />WITNESSETH: <br />That the County and Provider, for the consideration herein named, do hereby agree as <br />follows: <br />1. Services <br />a. Scope of Work. <br />i) This Services Agreement ( "Agreement ") is for professional services to be <br />rendered by Provider to County with respect to (insert type of project): Cleaning and <br />CCTV videoing of Phase 3 (approximately 7,300 linear feet) and Phase 5 <br />(approximately 5,900 linear feet) of the gravity sewer lines in the Efland Sewer <br />System, as depicted within the BID SUMMARY, Exhibit A, and Exhibit B within <br />the Transstate, LLC Bid Package dated April 24, 2017 (see Attachment A). The <br />total length of gravity sewer lines to be cleaned and CCTV videoed within this <br />Agreement is approximately 13,200 linear feet. CCTV videoing is a State sewer <br />requirement. It will be the Provider's responsibility to secure a portable fire- hydrant <br />meter from Orange Alamance Water System (OAWS), but Orange County will pay <br />for the water used in the sewer cleaning operation. Please arrange for the OAWS <br />invoice to be sent to the Planning & Inspections Department's attention, Engineering <br />/ Stormwater Division. <br />ii) By executing this Agreement, the Provider represents and agrees that Provider is <br />qualified to perform and fully capable of performing and providing the services <br />required or necessary under this Agreement in a fully competent, professional and <br />timely manner. <br />iii) Time is of the essence with respect to this Agreement. <br />iv) The services to be performed under this Agreement consist of Basic Services, as <br />described and designated in Section 3 hereof. Compensation to the Provider for <br />Basic Services under this Agreement shall be as set forth herein. <br />2. Responsibilities of the Provider <br />Revised 10/17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.