Browse
Search
Agenda - 04-20-2018 6-a - Major Subdivision Preliminary Plat Application – Triple Crown Farms
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2018
>
Agenda - 04-17-2018 Regular Meeting
>
Agenda - 04-20-2018 6-a - Major Subdivision Preliminary Plat Application – Triple Crown Farms
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2018 3:58:05 PM
Creation date
4/12/2018 4:06:01 PM
Metadata
Fields
Template:
BOCC
Date
4/17/2018
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6-a
Document Relationships
Agenda - 04-20-2018 Regular Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2018\Agenda - 04-17-2018 Regular Meeting
Minutes 04-17-2018
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2018
RES-2018-020 Resolution approving revised preliminary plan for Triple Crown Farms
(Message)
Path:
\Board of County Commissioners\Resolutions\2010-2019\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Composition <br />of road <br /> <br />4” Compacted <br />Aggregate Base <br />And <br />2” Travel lane base <br />material (i.e. gravel, <br />concrete, asphalt) <br /> <br /> <br />8” Compacted Aggregate Base <br /> <br />And <br /> <br />2” Travel lane base material (i.e. asphalt) <br />Typical cross <br />section for <br />drainage <br />ditches <br /> <br /> <br /> <br />Maximum <br />allowable <br />grade of road <br /> <br />12% 12% <br /> <br />Orange County does not have a road/structural design standard associated with <br />stream crossings. We either defer to an engineered design, which is <br />reviewed/approved by County staff (i.e. Current Planning, Fire Marshal, Building <br />Inspections, Engineering, etc.), or require the developer to defer to NCDOT design <br />standards. <br /> <br />f. What is the applicant’s justification supporting the requested modification? <br />STAFF COMMENT: As previously indicated there was a dearth of information <br />provided at the April 3, 2018 BOCC regular meeting in support of this request. The <br />project engineer has since provided additional detail, which is contained in Attachment <br />3. <br /> <br />g. If the modification is approved, how can the County guarantee property owners are advised of <br />their responsibilities to maintain the road(s)? <br /> STAFF COMMENT: Staff has recommended imposition of the following conditions <br />if the modification is approved: <br />i. Development and recordation of a Private Road Maintenance <br />Agreement (RMA) denoting all roadways are private and shall be <br />maintained by the local property owners. This agreement will have to be <br />recorded within the Orange County Registrar of Deeds Office. <br />5
The URL can be used to link to this page
Your browser does not support the video tag.