Browse
Search
Agenda - 6-a - Major Subdivision Preliminary Plat Application – Triple Crown Farms
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2018
>
Agenda - 04-17-2018
>
Agenda - 6-a - Major Subdivision Preliminary Plat Application – Triple Crown Farms
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2018 3:58:05 PM
Creation date
4/12/2018 3:35:47 PM
Metadata
Fields
Template:
BOCC
Date
4/17/2018
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6-a
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 5, 2018 <br />Orange County Planning Department <br />200 South Cameron Street <br />P.O. Box 8181 <br />Hillsborough, NC 27278 <br />Attention: Craig Benedict, Director <br />c/o Patrick Mallett, Planner <br />A <br />401 Providence Road, Suite 200 <br />Chapel Hill, INC 27514 <br />T: 919 - 929 -1173 <br />F: 919 - 493 -6548 <br />Firm License #: F -1267 <br />www.pennoni.com <br />RE: Request for Private Subdivision Roadways <br />Triple Crown Farms Subdivision <br />Triple Crown Drive <br />Chapel Hill, Orange County, NC <br />Project: PKLA1601 <br />Dear Mr. Mallett: <br />At the April 3, 2018 Board of County Commissioner's meeting, discussions were held with regard to the <br />applicant's request to modify the previously approved Major Subdivision Preliminary Plat application. Said <br />request is to modify the original approval which indicated that the internal subdivision roadways be <br />constructed to NCDOT public road standards; the applicant is requesting to provide private roadways. <br />The primary reason for this requested change relates to permitting required by the Army Corp of Engineers <br />and NC Division of Water Resources. A maximum 150 linear feet of channel disturbance is permitted before <br />mitigation is required. The attached exhibit (dated April 5, 2018) illustrates how the DOT standards would <br />have required impacts to the existing on -site streams well beyond the 150 - linear foot threshold. <br />Although the applicant is requesting that the internal subdivision roadways be private, please note that the <br />roadways have been designed and will be constructed to meet the NCDOT Subdivision Road standards, <br />except for the crossings. <br />Attached also please find the following documents prepared by the applicant in conjunction with the <br />request: <br />• Declaration of Covenants, Conditions, Easements, and Restrictions for Triple Crown Farms, and <br />• Declaration of Restrictions and Provisions for Private Road Maintenance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.