Orange County NC Website
n. National Intelligent Transportation Systems Architecture and Standards. To the extent applicable, <br />the Grantee agrees to conform to the National Intelligent Transportation Systems (ITS) Architecture <br />and Standards as required by SAFETEA -LU § 5307(c), 23 U.S.C. § 512 note, and comply with <br />FTA Notice, "FTA National ITS Architecture Policy on Transit Projects" 66 Fed. Reg. 1455 et seq., <br />January 8, 2001, and any subsequent further implementing directives, except to the extent FTA or <br />the Department determines otherwise in writing. <br />o. Rolling Stock. In acquiring rolling stock, the Grantee agrees as follows: <br />(1) Method of Acquisition. The Department's Public Transportation Division, through the North <br />Carolina Department of Administration, Purchase and Contract Division, awards vehicle <br />contracts for its grant recipients to purchase public transit vehicles. These vehicle contracts <br />comply with FTA and State requirements. The Grantee will utilize these vehicle contracts to <br />purchase public transit vehicles included in the Approved Budget for this Project. For public <br />transit vehicles not included in these contracts, the Grantee shall conduct a competitive <br />procurement process in accordance with this Agreement. <br />(2) Multi -year Options. In accordance with 49 U.S.C. § 5325(e)(1), the Grantee may not enter <br />into a multi -year contract with options, exceeding five (5) years after the date of the original <br />contract, to purchase additional rolling stock and replacement parts. <br />(3) Pre -Award and Post - Delivery Requirements. The Grantee agrees to comply with the <br />requirements of 49 U.S.C. § 5323(m) and FTA regulations, "Pre -Award and Post - Delivery <br />Audits of Rolling Stock Purchases," 49 C.F.R. Part 663 and, when promulgated, any <br />amendments to those regulations. The Grantee understands and agrees that to the extent <br />the provisions of 49 U.S.C. § 5323(m), as amended by the FAST Act, MAP -21 or SAFETEA- <br />LU conflict with FTA's implementing regulations, as currently promulgated, the provisions of <br />49 U.S.C. § 5323(m), as amended, prevail. <br />(4) Bus Testing. To the extent applicable, the Grantee agrees to comply with the requirements <br />of 49 U.S.C. § 5318(e) and FTA regulations, "Bus Testing," 49 C.F.R. Part 665, and any <br />amendments to those regulations that may be promulgated. <br />p. Bonding. For construction projects, the Grantee agrees to provide bid guarantee bond (5% of bid <br />price) and performance and payment bonds (100% of contract price) and comply with any other <br />construction bonding provisions as the Department may determine. <br />q. Architectural, Engineering Design, or Related Services. For all architectural, engineering, design, <br />or related services the Grantee shall use qualifications -based competitive proposal [Request for <br />Qualifications (RFQ) in accordance with the Brooks Act] procedures. The Grantee shall follow <br />applicable statutes, N.C.G.S. 143 - 64.31 -34, and requirements set forth in FTA Circular 4220.1 F as <br />amended, to retain a qualified, registered architect or professional engineer: <br />(1) The Grantee agrees to comply with qualifications -based competitive proposal procedures, <br />which require: <br />(a) An offeror's qualifications be evaluated; <br />(b) Good faith effort to use minority -owned businesses; <br />(c) Price be excluded as an evaluation factor; <br />(d) Negotiations be conducted with only the most qualified offeror; and <br />(e) Failing agreement on price, negotiations with the next most qualified offeror be <br />conducted until a contract award can be made to the most qualified offeror whose <br />price is fair and reasonable. <br />(2) Geographic location may be a selection criterion in procurements for architectural and <br />engineering (A &E) services provided its application leaves an appropriate number of <br />qualified firms, given the nature and size of the project, to compete for the contract. <br />(3) The Grantee acknowledges and agrees that qualifications -based competitive proposal <br />procedures can only be used for procurement of the following services: <br />(a) Program management; <br />(b) Construction management; <br />(c) Feasibility studies; and <br />(d) Preliminary engineering, design, architectural, engineering, surveying, mapping, and <br />related services. <br />05127/2015 Page 18 of 36 <br />