Browse
Search
2018-113-E AMS - TA Loving Sportsplex Field House Change Order 1
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-113-E AMS - TA Loving Sportsplex Field House Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2019 3:16:29 PM
Creation date
4/11/2018 3:35:24 PM
Metadata
Fields
Template:
Contract
Date
3/18/2018
Contract Starting Date
3/14/2015
Contract Document Type
Contract Amendment
Amount
$188,555.00
Document Relationships
2017-194-E AMS - T.A. Loving Company to design-build services for Sportsplex field house
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
R 2018-113 AMS - TA Loving Sportsplex Field House Change Order 1
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 268A3BOE -EA34- 4541- 9E6D- 48A5B8835EO5 <br />Orange County Sportslex Fieldhouse <br />VE Options for Alternate No. 1— Connector <br />1. BP 0400 - Masonry ACCEPTED <br />a. Change block to a paint grade split face CMU w/ dry block additive CREDIT ($19,350.00) <br />Requires painting <br />b. ADD to paint exterior block - $1.65/SF. Approximately 1500 SF = $2,475 <br />c. NET CREDIT— ($16,875.00) <br />2. BP 0600 — Millwork NOT ACCEPTED <br />a. Delete wood capon divider wall between ramp and Fitness Room. CREDIT ($842) <br />b. No cost from drywall to finish this off on top. <br />3. BP 0800 — Doors, Frames and Hardware ACCEPTED - rough estimate provided. <br />a. Delete 2 doors (toilet rooms) and all toilet accessories. CREDIT tbd. Have been trying to <br />get from Martin Architectural. <br />4. BP 0840 — Glazing ACCEPTED - 2 windows in connector in lieu of 4 - ($3k) <br />a. Delete windows in connector. CREDIT ($6,000) <br />b. No cost from drywall or metal panel to fill these in. <br />5. BP 0925 — Drywall ACCEPTED <br />a. Delete drywall walls between Toilet 001 /Toilet 002 and Toilet 002 /Storage 003. CREDIT <br />($750) <br />b. Delete drywall ceiling in these rooms. CREDIT ($550) <br />c. Have to ADD for cement board sheathing at roof. <br />6. BP 0960 —Soft Flooring ACCEPTED <br />a. Reduction of RexCourt flooring due to ramp. CREDIT ($1,080) <br />7. BP 2100 — Fire Sprinkler ACCEPTED <br />a. Discussed options for wet and dry systems. No real cost savings to go to dry but will <br />require more maintenance. If we can have unit heater and maintain 40 degree temp, <br />seems less maintenance to stay wet system like the rest of the building. <br />8. BP 2200 — Plumbing ACCEPTED <br />a. Delete bathrooms would delete all plumbing. CREDIT ($25,660) <br />9. BP 2300 - HVAc ACCEPTED <br />a. Delete WH -2, WH -3, EF -4, EF -2. Keep WH -4 for storage. CREDIT ($1,050) <br />Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.