Browse
Search
2018-113-E AMS - TA Loving Sportsplex Field House Change Order 1
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-113-E AMS - TA Loving Sportsplex Field House Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2019 3:16:29 PM
Creation date
4/11/2018 3:35:24 PM
Metadata
Fields
Template:
Contract
Date
3/18/2018
Contract Starting Date
3/14/2015
Contract Document Type
Contract Amendment
Amount
$188,555.00
Document Relationships
2017-194-E AMS - T.A. Loving Company to design-build services for Sportsplex field house
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
R 2018-113 AMS - TA Loving Sportsplex Field House Change Order 1
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 268A3BOE -EA34- 4541- 9E6D- 48A5B8835EO5 <br />Evia Nelson <br />Project Manager <br />Building Division <br />TA,LOVING <br />LOVING COMPANY <br />400 PATETOWN ROAD I GOLDSBORO, NORTH CAROLINA 27530 <br />919.583.1267 (C) 1 919.734.8400 (T) 1 919.731.7538 (F) <br />From: Evia Nelson <br />Sent: Wednesday, January 17, 2018 1:00 PM <br />To: Christopher Young <cyoung @searscontract.com> <br />Cc: Evia Nelson <enelson @taloving.com >; Ray Carrino <rcarrino @taloving.com> <br />Subject: Orange County Sportsplex connector - DRYWALL <br />Hi Chris — <br />I'm sure you saw my email earlier today about trying to reduce costs on the Connector Alternate. Sears Contract's price <br />for Alternate #2, connector was $11,880. I've been looking at the plans and had conversations with the Owner to figure <br />out what might be acceptable. Here are a few drywall options that would like to get breakout pricing for: <br />1. Delete the drywall walls between Toilet 001 /Toilet 002 and Toilet 002 /Storage 003. Wall Type A6 per 2/A1.1a. <br />This will become one large block room. <br />2. Provide price to delete the drywall ceiling in these rooms (Detail 4/A1.1a) <br />3. At the ramp adjacent to Exercise 110, there is a 6' knee wall that calls for a wood cap. What would the price <br />difference be if we just made it a finished drywall top? Nothing? <br />4. If we deleted the windows in the connector, would there be an increase to fill those openings with drywall? I'm <br />not thinking there would be since it would have to be cut out and /or framed around if they were in. <br />The balance of your work includes the structural studs on the 2nd level of the connector, a painted gyp ceiling in the <br />connector. Do you have the structural cement board on top of the connector and all structural stud framing shown on <br />S1.1a? <br />Also, please let me know if you have any other ideas how we can cut costs on the connector. <br />If you could have this information to me by Tuesday, 1/23/18 that will allow me to compile options and meet with the <br />Owner. <br />Thanks, <br />Evia <br />Evia Nelson <br />Project Manager <br />Building Division <br />TA,LOVING <br />LOVING COMPANY <br />400 PATETOWN ROAD I GOLDSBORO, NORTH CAROLINA 27530 <br />
The URL can be used to link to this page
Your browser does not support the video tag.