Browse
Search
2018-113-E AMS - TA Loving Sportsplex Field House Change Order 1
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-113-E AMS - TA Loving Sportsplex Field House Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2019 3:16:29 PM
Creation date
4/11/2018 3:35:24 PM
Metadata
Fields
Template:
Contract
Date
3/18/2018
Contract Starting Date
3/14/2015
Contract Document Type
Contract Amendment
Amount
$188,555.00
Document Relationships
2017-194-E AMS - T.A. Loving Company to design-build services for Sportsplex field house
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
R 2018-113 AMS - TA Loving Sportsplex Field House Change Order 1
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 268A3BOE -EA34- 4541- 9E6D- 48A5B8835EO5 <br />Evia Nelson <br />From: Christopher Young <cyoung @searscontract.com> <br />Sent: Wednesday, January 24, 2018 3:12 PM <br />To: Evia Nelson <br />Subject: RE: Orange County Sportsplex connector - DRYWALL <br />Evia, <br />Original - $29,500 <br />VE #1 - ($750) <br />VE #2 - ($550) <br />New value - $28,200 <br />Good afternoon. Please see responses below. Also our connector Price was $29,500 not $11,880 ? <br />1. Delete the drywall walls between Toilet 001 /Toilet 002 and Toilet 002 /Storage 003. Wall Type A6 per 2/A1.1a. <br />This will become one large block room. (Deduct - $750.00) <br />2. Provide price to delete the drywall ceiling in these rooms (Detail 4/A1.1a) (Deduct - $550.00) <br />3. At the ramp adjacent to Exercise 110, there is a 6' knee wall that calls for a wood cap. What would the price <br />difference be if we just made it a finished drywall top? Nothing? No Change <br />4. If we deleted the windows in the connector, would there be an increase to fill those openings with drywall? I'm <br />not thinking there would be since it would have to be cut out and /or framed around if they were in. No Change <br />The balance of your work includes the structural studs on the 2 "d level of the connector, a painted gyp ceiling in the <br />connector. Do you have the structural cement board on top of the connector and all structural stud framing shown on <br />S1.1a? The Cement Board Rood Sheathing is NOT included in our pricing. Sears has all of the metal stud framing and <br />gypsum ceiling covered in our price. This will become a contingency item. Not in steel or metal building scope. <br />Please let me know if you have any additional questions. Just to let you know we are also seeing material price increases <br />and this portion of work has not been locked in. We need to get this figured out pretty quick in order to reduce risk of <br />material increases. Thanks. <br />Thanks, <br />Chris Young <br />P T -11 <br />3813 Beryl Road Raleigh, NC 27607 <br />P.O. Box 33429 Raleigh, NC 27636 <br />Office: 919.754.0750 Ext 122 1 Fax: 919.754.0890 <br />Web: www.searscontract.com <br />From: Evia Nelson [mailto:enelson @taloving.com] <br />Sent: Wednesday, January 24, 2018 10:56 AM <br />To: Christopher Young <cyoung @searscontract.com> <br />Cc: Evia Nelson <enelson @taloving.com> <br />Subject: RE: Orange County Sportsplex connector - DRYWALL <br />Good morning Chris — can you give me an update on this? I'm trying to put together final information for Orange County. <br />Sent last week with deadline for yesterday. <br />Please advise. <br />Thank you! <br />
The URL can be used to link to this page
Your browser does not support the video tag.