Orange County NC Website
DocuSign Envelope ID: 268A3BOE -EA34- 4541- 9E6D- 48A5B8835EO5 <br />ale: BRODIE CONTRACTORS, INC. we <br />P.0- 113OX 18973 RAt..B1fa`H, NC 27819 a 9196- 782 -2482 R PAX 919- 782 -2082 <br />December 21, 2017 <br />To: Evia Nelson <br />TA Loving Company <br />Goldsboro, NC <br />Re: Orange County Sportsplex - Connector <br />Hillsborough, NC <br />Original Price - $66,950 <br />Dear Sirs, <br />We are pleased to quote the following lump sum masonry price for the above referenced project. <br />This price includes all labor, materials, equipment and supervision to produce a complete masonry project <br />within the following scope of work. <br />NORTH APARTMENT BUILDING = $66,950.00 BOND NOT INCLUDED =1 % ADD <br />Scope of Work Spec section: Unit Masonry 042000 through clarification #0 <br />Qualifications and Exclusions to Scope <br />1. Items included (labor and materials): <br />a. CMU — Regular lightweight block & sand blasted at exposed walls <br />b. Mortar — Natural gray at reg. CMU & special color at all sand blasted CMU w/ water repellant <br />c. Sand — Regular sand <br />d. Grout fill at masonry <br />e. Rebar at masonry <br />f. Drill & epoxy dowels as shown (CMU walls on thickened slabs) <br />g. Horizontal joint reinforcing <br />h. Control joint material at CMU <br />i. Clean sand blasted CMU <br />j. Small sample panel <br />k. Cut new opening in concrete tilt -up wall ( +/ -6' wide x 8' high) <br />I. Insulation at CMU walls (all cells insulated if not reinforced w/ grout) <br />2. Items supplied by others and installed by Brodie Contractors: <br />a. Set hollow metal door frames in CMU <br />3. Items not included (material or labor): <br />a. Water, electric & temporary facilities <br />b. Waterproofing and /or damproofing (if required) <br />c. Fire safing insulation at CMU walls (if required) <br />d. Caulking (rated & non - rated) / backer rods <br />e. Temporary wall(s) where new openings are created in existing building(s) <br />f. Removal of trash from site <br />g. Insulation at underside of floor ramp in crawl space <br />h. Engineering — if required for new opening in existing CMU wall <br />If you have any questions please call. <br />Respectfully, <br />Douglas Gray <br />Brodie Contractors, Inc. <br />