DocuSign Envelope ID: 7CA9F312 -OE3F- 4312- A9FO- 824BA9C39BCF
<br />Irerracon
<br />$75.00
<br />SPECIAL INSPECTIONS / MATERIALS TESTING SERVICES
<br />$100.00
<br />UNIT RATE FEE SCHEDULE - 2018
<br />$150.00
<br />RALEIGH, N.C.
<br />$10.00
<br />PERSONNEL /FIELD SERVICES
<br />$95.00
<br />1. Field Technician, per hour* ..................._.._..................................... ........_.._...................
<br />$52.00
<br />2. Field Special Inspector, per hour* .................................................... ...............................
<br />$78.00
<br />3. Asphalt Inspector, per hour*.. .................................................................... ...................
<br />$75.00
<br />4. Remote Visual Inspector (Borescope ASNT Lv2), per hour* .................. ...............................
<br />$105.00
<br />5. Certified Welding Inspector, per hour* .............................................. ...............................
<br />$105.00
<br />6. Ultrasonic Testing Inspector (ASNT Lv 2/1-0), per hour* ...................... ...............................
<br />$125.00
<br />7. Ultrasonic Testing, equipment per day .............................................. ...............................
<br />$115.00
<br />8. Magnetic Particle or Dye Penetrant Testing Inspector (ASNT Lv2/ Lv 3), per hour * * ..................
<br />$125.00
<br />9. Penetrant Testing Consumables (PT), per day** ................................ ...............................
<br />$200.00
<br />10. Magnetic Particle Consumables (MT), per day** ................................. ...............................
<br />$125.00
<br />11. Ultrasonic Testing Consumables (UT), ( Couplant)** ............................ ...............................
<br />$100.00
<br />12. Borescope, equipment per day ....................................................... ...............................
<br />$250.00
<br />13. Borescope, equipment per month (long term work) ............................. ...............................
<br />$2,000.00
<br />14. Coring Crew, per hour (Includes equipment) ..................................... ...............................
<br />$150.00
<br />15. Nuclear Density Gauge, per day ..................................................... ...............................
<br />$35.00
<br />16. Floor Flatness Inspector, (On site time only), per hour * ........................ ...............................
<br />$75.00
<br />17. Floor Flatness and Levelness testing, equipment per day ..................... ...............................
<br />$150.00
<br />18. Field Engineer, per hour ................................................................ ...............................
<br />$95.00
<br />19. Project Manager, per hour ............................................................. ...............................
<br />$145.00
<br />20. CADD Support, per hour ............................................................... ...............................
<br />$75.00
<br />21. GPR Inspector, per hour* .............................................................. ...............................
<br />$125.00
<br />22. GPR testing, Inspector /equipment per day ........................................ ...............................
<br />$2,000.00
<br />23. Senior Engineer /Principal, per hour ................................................. ...............................
<br />$160.00
<br />24. Clerical, per hour ......................................................................... ...............................
<br />$50.00
<br />25. Direct Expenses .......................................................................... ...............................
<br />115%
<br />26. Per Diem, per day ....................................................................... ...............................
<br />$165.00
<br />27. Mileage, per mile .......................................................................... ...............................
<br />$0.72
<br />LABORATORY SERVICES
<br />1. Percent Fines (Wash 200 sieve), each ............................................. ...............................
<br />$75.00
<br />2. Sieve Anaylsis, each .................................................................... ...............................
<br />$100.00
<br />3. Particle Size Analysis (With Hydrometer), each .................................. ...............................
<br />$150.00
<br />4. Natural Moisture Content Test, each ................................................ ...............................
<br />$10.00
<br />5. Atterberg Limits Test, each ............................................................ ...............................
<br />$95.00
<br />6. Standard Proctor Compaction Test, each ......................................... ...............................
<br />$165.00
<br />7. Standard Proctor Compaction Test (with Rock Correction), each ........... ...............................
<br />$185.00
<br />8. Modified Proctor Compaction Test, each .......................................... ...............................
<br />$185.00
<br />9. Modified Proctor Compaction Test (with Rock Correction), each ............ ...............................
<br />$200.00
<br />10. CBR Testing, per point ................................................................. ...............................
<br />$200.00
<br />11. Fireproof density testing, per sample ............................................... ...............................
<br />$35.00
<br />12. Concrete Compressive Strength Testing of 4 x 8 or 6 x 12 inch Cylinders, each .......................
<br />$15.00
<br />13. Concrete Compressive Strength Testing of Contractor made 4 x 8 or 6 x 12 inch Cylinders, each
<br />$18.00
<br />14. Concrete Flexural Strength Testing of 6 x 6 x18 inch Beams, each ......... ...............................
<br />$55.00
<br />15. Concrete Compressive Strength Testing of Cores, each ...................... ...............................
<br />$55.00
<br />16. Masonry Mortar Compressive Strength Testing of 2" x 2" Cubes, each .... ...............................
<br />$15.00
<br />17. Masonry Compressive Strength Testing of Grout Prisms, each .............. ...............................
<br />$50.00
<br />18. Masonry Block Absorption and Compressive Strength, per set of 6 ........ ...............................
<br />$350.00
<br />19. Masonry Block Prism Compressive Strength, each ............................. ...............................
<br />$150.00
<br />20. Asphalt Core Specific Gravity (thickness and density) Testing, each ....... ...............................
<br />$50.00
<br />21. Asphalt Maximum Theoretical Specific Gravity (Rice) Testing, each ....... ...............................
<br />$225.00
<br />22. Asphalt Content (Burn) and Aggregate Gradation, each ....................... ...............................
<br />$250.00
<br />. r minimum oT L nours win oe cnargea Tnr an neiu Tecnmaan ume. Increase nouny race oy - Tor services Provo- on 3acuraay,
<br />in excess or
<br />8 hours per day and /or Monday through Friday before 7:OOA.M. or after 6:00 P.M. Increase hourly rate by 1.5 for services provided on
<br />Sundays or Holidays with a minimum charge of 2 hours. Overtime is not applicable to engineering rates. Project administration
<br />rates are for
<br />report review, etc. Hourly charges will be billed portal to portal. Quoted rates will be effective throughout 2017.
<br />* *(PT) consumables, per day/ field kit includes an 8 can aerosol kit (visible dye penetrant only). (MT) consumables, per day cost
<br />is limited to
<br />10lbs (visible Magnetic Particles only). Ultrasonic Couplant (UT), per day cost is limited to 1 gallon/ 3.8 liter cubitainer. Additional
<br />quantities or
<br />fluorescent consumable will require separate quote; expense will be based on cost plus 15 %.
<br />
|