Browse
Search
2018-109-E AMS - Civil Consultants Consulting Contract Property Investigation Millhouse Road
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-109-E AMS - Civil Consultants Consulting Contract Property Investigation Millhouse Road
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2018 4:33:08 PM
Creation date
4/11/2018 3:29:56 PM
Metadata
Fields
Template:
Contract
Date
3/28/2018
Contract Starting Date
3/28/2018
Contract Document Type
Agreement - Consulting
Amount
$15,000.00
Document Relationships
R 2018-109 AMS - Civil Consultants Consulting Contract Property Investigation Millhouse Road
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: E37E96C1 -05A7- 4217- 9F15- 86F6C52AODAB <br />8. Investigate alternative wastewater treatment and disposal system; coordinate with <br />County staff and State of NC regulators regarding pilot program for potential <br />alternative system use for the project. <br />9. Attend a maximum of four meetings to discuss and present recommendations. <br />Orange County will provide for Engineer's use CAD -based mapping from GIS or other <br />sources showing the following information for the parcel and extending at least 500 feet <br />all around the parcel: <br />• Property boundaries <br />• Planimetric and terrain data including buildings, roadways, streams, stream <br />buffers, water features, floodplain, pavement limits, etc. <br />• Topography with 2' vertical intervals <br />• Base zoning and any zoning overlay districts <br />• Town ETJ(s) or limit of Utility Service Area <br />• Locations of existing public water and sewer lines <br />• Aerial imagery <br />Compensation: <br />Client shall compensate Engineer for project work performed on an hourly basis, at the <br />hourly rates listed below. This agreement authorizes up to $15,000.00 for the general <br />scope of work described. <br />Tony M. Whitaker, PE <br />President <br />Schedule of Billina Rates <br />Classification Hourly Rate <br />Principal Engineer <br />$170.00 <br />Land Development Manager <br />$160.00 <br />Senior Designer <br />$125.00 <br />Designer Technician <br />$95.00 <br />Administrator <br />$75.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.