Browse
Search
Agenda - 02-01-2005-9a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2005
>
Agenda - 02-01-2005
>
Agenda - 02-01-2005-9a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 10:49:40 PM
Creation date
8/29/2008 10:03:32 AM
Metadata
Fields
Template:
BOCC
Date
2/1/2005
Document Type
Agenda
Agenda Item
9a
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14 <br />There are three banks that manage the card reader technology for fueling <br />stations of this type, and in each case the banks bill the entity or user, including <br />bank charges that are added to the bill. <br />Staff has examined the possibility of public access to the CNG station at the <br />Public Works site. Although it is not immediately adjacent to interstate highways, <br />the site is within 5 miles and 10 minutes of exits on 1-40/85 and 1-85. The fueling <br />station at Public Works is located outside of the Public Works facility gates, so <br />vehicular access to the site would be possible (EMS, OPT and Sheriffs vehicles <br />fuel after hours). <br />The potential for allowing access for government, commercial and private <br />vehicles does appear to exist, and the Work Group would propose that access be <br />allowed on either a limited or 24/7 basis, assuming that liability and logistical <br />issues can be worked out. If access is allowed, the pump and card reader could <br />be allowed to run 24/7, or could be turned off at the close of business day if <br />desired. The heavy-plated pumps, storage units and compressors associated <br />with CNG fueling do not appear to add any additional vandalism or fire risk. If a <br />leak were to occur, the primarily-methane CNG dissipates into the atmosphere, <br />unless the leak occurs in a unventilated building. <br />3. Possible Timetable of Activities <br />As noted previously, one condition of the $25,000 grant from the Clean Cities <br />Coalition is the encumbrance of funds must occur by June 30, 2005. This will <br />mean that the project will need to proceed without delay as soon as practicable. <br />One timetable staff has identified for the project would be as follows: <br />January 2005 Board receives CNG Work Group report <br />February 2005 Board approves siting recommendation and <br /> authorizes engineering drawings and bid solicitation <br />March 2005 Town of Hillsborough site plan approval (21 days) <br />April 2005 Bids received and contract awarded by BOCC <br />May 2005 Building permits (Orange County Planning and <br /> Inspections) <br />June 2005 Construction begins <br />September 2005 Construction ends <br />October 2005 CNG fueling Station open for use <br />4. Future AFV Issues - On the Horizon <br />Because the field of AFV technology is rapidly changing, it remains difficult to <br />predict with certainty what sort of technology will emerge in future years. For the <br />last several years, governments and industries that have begun branching into <br />AFV's have been advised to not "put all of your eggs in one basket." Electric
The URL can be used to link to this page
Your browser does not support the video tag.