Orange County NC Website
M. <br />SUPPORTING DATA. Data reviewed for PJD (check all that apply) <br />Checked items should be included in subject file. Appropriately reference sources below where <br />indicated for all checked items: <br />® Maps, plans, plots or plat submitted by or on behalf of the PJD requestor: <br />Map: Sketch Mao <br />® Data sheets prepared /submitted by or on behalf of the PJD requester. <br />® Office concurs with data sheets /delineation report. <br />❑ Office does not concur with data sheets /delineation report. Rationale: <br />❑ Data sheets prepared by the Corps: <br />❑ Corps navigable waters' study: <br />❑ U.S. Geological Survey Hydrologic Atlas: <br />® USGS NHD data. <br />❑ USGS 8 and 12 digit HUC maps. <br />® U.S. Geological Survey map(s). Cite scale & quad name: NC USGS Bynum Quad <br />® Natural Resources Conservation Service Soil Survey. Citation: Chatham County Soil Survey Sheet G1 <br />National wetlands inventory map(s). Cite name: Corps GIS data <br />❑ State /local wetland inventory map(s): <br />® FEMA/FIRM maps: Corps GIS data <br />❑ 100 -year Floodplain Elevation is: (National Geodetic Vertical Datum of 1929) <br />® Photographs: ®A erial (Name & Date): Unnamed and undated provided by consultant <br />or ❑Other (Name & Date): <br />❑ Previous determination(s). File no. and date of response letter: <br />® Other information (please specify):LiDAR, DEM, 2 foot contour digital data (Corps GIS data) <br />IMPORTANT NOTE: The information recorded on this form has not necessarily been <br />verified by the Corns and should not be relied upon for later iurisdictional <br />determinations. <br />Digitally signed by <br />WI LLIAMSANDRE W.E.1244561655 <br />A� /- 1 DN: c =US, o =U.S. Government, <br />i�/ ou =DoD, ou= PKl,ou =USA, <br />cn= W I W AMS.ANDREW.E.1 244561 65 5 <br />Date: 2017.07.21 15:34:34 - 04'00' <br />Signature and date of Regulatory <br />staff member completing PJD <br />Signature and date of person <br />requesting PJD (REQUIRED, <br />unless obtaining the signature <br />is impracticable)' <br />1 Districts may establish timeframes for requester to return signed PJD forms. If the requester does not respond within the <br />established time frame, the district may presume concurrence and no additional follow up is necessary prior to finalizing <br />an action. <br />