Browse
Search
Agenda - 04-03-2018 8-e - Major Subdivision Preliminary Plat Application – Morgan Ridge Subdivision
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2018
>
Agenda - 04-03-2018 Regular Meeting
>
Agenda - 04-03-2018 8-e - Major Subdivision Preliminary Plat Application – Morgan Ridge Subdivision
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2018 3:53:14 PM
Creation date
3/29/2018 3:53:56 PM
Metadata
Fields
Template:
BOCC
Date
4/3/2018
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8-e
Document Relationships
Agenda - 04-03-2018 Regular Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2018\Agenda - 04-03-2018 Regular Meeting
Minutes 04-03-2018
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2018
RES-2018-021 Resolution in support of Major Subdivision Preliminary Plat Application – Morgan Ridge Subdivision
(Message)
Path:
\Board of County Commissioners\Resolutions\2010-2019\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
n <br />WATERSHED PROTECTION DIVISION <br />Environmental Quality Department <br />CHATHAM COUNTY P.O. Box 548 <br />NOlt I CAROLINA <br />Pittsboro, NC 27312 <br />PHONE: (919) 545 -8394 <br />Fax: (919) 542 -2698 • E -mail: drew.blake @chathamnc.org • Website: www.chathamnc.org <br />was identified as ephemeral by S &EC and Chatham County; however, the USACE determined the feature <br />to be an intermittent stream. <br />Required Riparian Buffers: <br />Streams A, B, D, E, and F will require a 50 -ft buffer from the top of bank landward on both sides of the <br />features. Stream C will require a 100 -ft buffer from the top of bank landward on both sides of the <br />features. All jurisdictional wetlands will require a 50 -ft buffer proceeding landward from the flagged <br />wetland boundary. <br />This on -site determination shall expire five (5) years from the date of this letter. Landowners or affected <br />parties that dispute a determination made by Chatham County, on parcels outside of the Jordan Lake <br />watershed, may submit a request for appeal in writing to the Watershed Review Board. A request for a <br />determination by the Watershed Review Board shall be made in accordance with Section 304 of the <br />Chatham County Watershed Protection Ordinance. Landowners or affected parties that dispute a <br />determination made by Chatham County, on parcels inside the Jordan Lake watershed, shall submit a <br />request for appeal in writing to NC DWR, 401 & Buffer Permitting Unit, 1650 Mail Service Center, <br />Raleigh, NC 27669 -1650 attention of the Director of the NC Division of Water Quality. <br />Should this project result in any direct impacts to surface water features (i.e., crossing and /or filling <br />streams or wetlands) additional reviews may be necessary. Additionally, a Section 404/401 Permit may <br />be required. Any inquiries regarding Section 404/401 permitting should be directed to the Division of <br />Water Resources (Central Office) at (919)- 807 -6364 and the US Army Corp of Engineers (Raleigh <br />Regulatory Field Office) at (919) -554 -4884. <br />Respectfully, <br />l�uw At/le, <br />Drew Blake <br />Watershed Specialist <br />Enclosures: USACE Notification of Jurisdictional Determination dated July 21, 2017 <br />(provided by Warren Mitchell) <br />cc: Rachael Thorn, Chatham County Watershed Protection Supervisor <br />Lynn Richardson, Chatham County Subdivision Administrator <br />Jason Sullivan, Chatham County Director of Planning <br />Brian Burkhart, Chatham County Director of Environmental Quality <br />
The URL can be used to link to this page
Your browser does not support the video tag.