Browse
Search
Agenda - 02-01-2005-5e
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2005
>
Agenda - 02-01-2005
>
Agenda - 02-01-2005-5e
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 10:50:15 PM
Creation date
8/29/2008 10:03:27 AM
Metadata
Fields
Template:
BOCC
Date
2/1/2005
Document Type
Agenda
Agenda Item
5e
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Updated June 17. 2004 to reflect addition of Parks Operations Base <br />Updated August 31. 2004 to reflect projects that the BOCC approved for funding with two-thirds net debt bonds on June 23. 2004 <br />Proposed Projects to Fund with 2004 Two-Thirds Net Debt Bonds + <br />$4.2 Million Available <br />Yellow highlighted rows indicate projects that the BOCC approved for funding with two-thirds net debt bonds on June 23, 2004 <br />Projects BOCC Has Approved for Additional Funding <br />Whiffed Human Services n c o er , the oar directed staff to include is amount to the up a e ive <br />Center " $475,000 year plan for the issuance of County bonds and alternative financing <br />Prniects BOCC Has Discussed Additional Fundina: Aooroval Pendina Further Discussion <br /> On March 16, 2004, the Board awarded a bid and approved a contract to Romeo <br /> Guest, Inc. for $706,166 for construction of the major elements of Little River Park; <br />Little River Park Development $272,000 this amount is $272,000 more than the currently available funds; the Board directed <br /> staff to include this amount in the updated five-year plan for the issuance of County <br /> bonds and alternative financing, to be presented during a BOCC meeting later this <br /> spring. (does not include Laws House disposition) <br /> On April 1, 2004, the Board discussed options for leasing space to accommodate the <br /> County's storage needs and directed staff to bring back a plan to fund and construct a <br /> new County storage facility to be located at the Public Works site. This amount covers <br /> the projected cost of a master site plan for the County's Public Works site and the first <br />Parks Operations Base and phase of storage facility construction. Commissioners will consider an item on <br />County Storage Facility $675,000 June 23 that recommends development of a building to be used as a parks <br />Located at Public Works site operation base at this site as well. Upon endorsement of the concept by the <br /> Board, a group of stakeholders will be convened by the Manager to determine ` <br /> the most expedient plan of action. <br />Prniarts fnr Recnmmended fnr 2004 Twn-Thirds Net Debt Reduction Bond Funding <br />Blackwood Farmhouse $75,000 To stabilize the existing structures located at the Blackwood Farm and preserve them <br />Stabilization and prevent further deterioration. <br />Cate Farmhouse Stabilization $125,000 To stabilize the existing structures located at the Cate Farm and preserve them and <br /> prevent further deterioration. <br />Central Recreation Repairs $235,000 Includes restroom repairs, office renovations and door/lock replacement <br />EMS/911 Center Repairs $315,000 Includes HVAC and flooring replacements along with parking area surfacing <br />t <br />d C <br />t <br />R <br />i <br />H $0 Original proposal included $70,000 for an OWASA Sewer connection; after further <br />rs <br />en <br />er <br />epa <br />omes <br />ea consideration, staff proposes that an on-site waste water treatment system <br />J <br />il R <br />ti 000 <br />$600 Includes renovating areas in the jail to accommodate female inmates and <br />a <br />enova <br />ons , attorney/inmate visitations <br />Lands Legacy $300,000 To provide "opportunity funds" to acquire land for the County's Lands Legacy program <br />New Courthouse Repairs ` $308,000 Includes exterior trim repairs, restroom repairs, and flooring replacement <br />Northern Human Services $300,000 Funding for projects, as the Board chooses, based on Sustainable Elements report by <br />Center Repairs Innovative Design. <br />Planning & Ag Building $370,000 Includes flooring replacements and funds to repair, not replace, HVAC system. <br />Repairs <br />Southern Human Services <br />$150'000 Restore funding, eliminated due to State budget reductions, to upfit house for use as <br />Center "Little House" public building. <br />Projects for Recommended for <br />2004 Two-Thirds Net Debt $4,200,000 <br />Reduction Bond Funding
The URL can be used to link to this page
Your browser does not support the video tag.