Orange County NC Website
63 <br />Conditions of Approval <br />Revised 8/06/14 <br />We look forward to working with you toward the successful completion of this project. If you <br />have questions about this letter or project, do not hesitate to contact Erosion Control personnel <br />at the telephone number in the letterhead. <br />Failure to appeal these conditions in writing within 15 days after receipt of this letter, or <br />initiation of land-disturbing activity, signifies your acceptance of these conditions of approval of <br />the erosion control plan and your intention to observe and implement the conditions. <br />S:\5--Erosion Control and Water Quality\Erosion Control and Water Quality\Jobs by year\New Work <br />17\ Orange\ Triple Crown Farms\ COA Triple Crown. docx 8 <br />