Orange County NC Website
61 <br />Conditions of Approval <br />Revised 8/06/14 <br />0 ENFORCEMENT ACTIONS: If there is, inadequate response to a verbal request or <br />Notice of Violation, m you fail toproperly implement the approved plan, enforcement <br />action will be taken against the 1.6 Parkside Lane LL[to bring the site into compliance. <br />Actions may include: <br />Stop Work Orders: All work not directly related to erosion and sediment control <br />and bringing the site into compliance, including building construction, must cease <br />until the site io brought into compliance. <br />Permit: Revocation of the Land-disturbing All work not directly related to erosion <br />and sediment control and bringing tbe site into compliance, including building and <br />home construction, must cease until the site is brought into compliance and another <br />permit ia purchased at the current rate. The Permit fee im$4574,0O. <br />fiugm: $5000 per day may be assessed per violation. Payment o/fines or for another <br />permit ia the responsibility of16 Parkmide Lane Ll,C', not your contractor. <br />Relief: Injunctive Legal action will be initiated in Superior Court to restrain the <br />violation and bring the site into compliance. <br />* : Disturbed areas must be stabilized within 7 or 14 calendar days of <br />terouiooduo / completion of any phase of grading per the following guidelines by u <br />temporary / permanent ground cover sufficient to restrain erosion. <br />Perimeter dikes, and slopes -7days <br />High Quality ' <br />Slopes 2:1or steeper -7days <br />Slopes between 2:1 and 3:1 greater than 1O' in length - 7daya <br />Slopes between 2:l and 3J less than 1O'6u length -14days <br />Slopes between 3:1 and 4:l less than 50'in length -l4days <br />Slopes between 3:I and 4:1 greater than 5O'bz length -7days <br />Slopes flatter than 4:1-l4days <br />Am long aa grading is not suspended more than the specified time period, the disturbed <br />areas do not have tobe stabilized until final grade io reached. However, if work is <br />delayed nr suspended for more than the specified time period and you are given a <br />written notice to stabilize it grading the area again does not allow you to disregard the <br />notice. If an area is to be worked again, it must bo graded and stabilized by the given <br />deadline. When construction is completed, all disturbed areas must have a permanent, <br />stabilizing ground cover applied within the specified time period. <br />The intent of this requirement isto limit erosion 6x completing the disturbance and <br />stabilizing disturbed areas iumo short obom aa possible. Io avoid stabilizing the 000z <br />area several times, schedule work eu that grading and other construction are <br />S:\5_Eromion Control and Water Erosion Control and Water \Tubabvyear\Y4epvWork <br />17\ Triple Crown Rarnm\COAIrb/leCronon.docx 6 <br />