Orange County NC Website
Conditions of Approval <br />Revised 8/06/14 <br />* COORDINATION BETWEEN CONTRACTORS AND : you <br />must ensure that sediment and umuioo control is coordinated during timbering, <br />clearing, grading, and construction eo that controls and devices are maintained and not <br />removed or damaged. If this site is subject to NCGO10000, logbook maintenance should <br />also bocoordinated. <br />* KEEP A COPY 0FTHE APPROVED PLAN ON THE SITE:The plan must lmavailable <br />to the contractor and inspection personnel. Faibzre to d000ie aviolmdon. <br />m DISPOSAL OF CLEARING AND DEMOLITION DEBRIS AND CONSTRUCTION <br />WASTE: All debris and waste resulting from development of the site 6nmh <br />dmozoGobed structures, construction *vadr, etc.) must be properly disposed of in <br />accordance with local and State regulations. Open burning of trees, limbs, stumps, and <br />construction debris is prohibited. Concrete, stumps and other clearing debris and <br />construction waste must be carried to appropriately permitted landfills. <br />^ <br />SITE INSPECTIONS: The Ordinance authorizes Erosion Control personnel to enter the <br />site for the purpose of investigation and inspection. Erosion Control personnel will <br />periodically inspect the site tmdetermine it the approved plan imbeing implemented and <br />ifitio successful. If problems or violations are found, the Erosion Control personnel will <br />attempt to contact site personnel to discuss with them and arrange corrections vvidbbz m <br />specified bozm. Also, a written site inspection report will be left with site personnel, in <br />the mailbox m+mite,ortransmitted in another manner. If you, or your contractor, have <br />4ueoboom about the inspection report contact the Erosion Control personnel <br />immediately -do not wait until the deadline to start asking questions. <br />p COMMUNICATIONS: Io addition tu leaving inspection reports oo-obe,a copy will be <br />ozaUmd and/or faxed to164'arkside Lane LLC. As the entity responsible for the land- <br />disturbing activity, you should ensure compliance with the approved erosion control <br />yIuo and see that your contractor corrects violations by the given deadline. Erosion <br />Control personnel are generally in their offices and available by phone between 8:00 and <br />9:00 a.m. and 4:30 and 5:OO y.nu, and have mobile phones as well. Feel free tocontact <br />them with any questions mrconcerns. <br />~ <br />PERSONNEL, EQUIPMENT, AND MATERIALS MUST BE AVAILABLE FOR <br />MAINTENANCE AND REPAIRS AT ALL TIMES: Maintenance iyo critical element of <br />the erosion control plan needed to ensure that devices continue to operate effectively. <br />You must be prepared to work on the devices when the need arises. In order to do this, <br />you may consider stockpiling certain materials such as stone, sediment fence and wire, <br />etc. <br />� PREPARING FOR WORK: Before beginning the project be certain that all necessary <br />materials, such oo skimmers, riseraboctures, pipes, etc., are available and ready for <br />delivery or already on site. <br />S:\5-Erosion Control and Water Quality\Erosion Control and Water bvyear\0aw Work <br />