59 <br />Conditions of Approval <br />Revised 8/06/14 <br />PERFORMANCE: The Ordinance is performance oriented. If it is determined that <br />sediment damage (sediment lost off site or into streams, water bodies, or buffers) is <br />occurring despite proper implementation and maintenance of the approved plan, it is <br />your responsibility to provide additional sediment trapping and/or erosion control <br />measures. Although the plan has been carefully reviewed, unexpected difficulties may <br />be inevitable, and you must resolve them. <br />RESTORATION OF AREAS DAMAGED BY SEDIMENT: You will be required to <br />restore waters and land affected if you fail to prevent sediment damage resulting from <br />this activity. This is in addition to any other penalty or injunctive relief. <br />CHANGES TO THE PLANS OR IN OWNERSHIP: If significant changes are required <br />to the approved plan, then you must have your designer make revisions and submit <br />copies to the Division upon request. If the site plan is revised in any way that affects <br />erosion and sediment control, you must inform us and submit revised plans. If <br />ownership of this project changes and responsibility is transferred to another person, <br />you or the new owner must inform us in writing with pertinent information such as <br />contact name, address, telephone and fax numbers. Otherwise, 16 1"arl(side Larke LLC <br />will be considered responsible. If you did not supply this office with the names and <br />addresses of all members of your partnership you are responsible for supplying them <br />with copies of this letter and any other correspondence from this office related to this <br />project. <br />COMPLETION OF DISTURBANCE IN AS SHORT A TIME AS POSSIBLE: <br />Sediment-trapping devices are not 100% effective in removing soil particles from runoff. <br />Therefore, the Ordinance requires that all land-disturbing activities be planned and <br />conducted to limit exposure to the shortest feasible time. To accomplish this requirement <br />construction must be continuous and uninterrupted until completion and permanent <br />stabilization. If construction is interrupted or delayed or the project is abandoned, the <br />site must be stabilized with adequate ground cover. <br />PROVIDE YOUR CONTRACTORS WITH A COPY OF THE APPROVED PLAN: <br />Make sure your contractor has a copy of the approved erosion control plan, has <br />considered it in their bid, and is prepared to proactively implement the plan. If phases of <br />the plan will be conducted by different subcontractors, 16 Parkside Lane 11C must <br />ensure that their efforts are coordinated so that the approved plan is followed: For <br />example: if the clearing and installation of the sediment trapping devices will be done by <br />different contractors, the clearing must not get ahead of construction of the devices. As <br />stated in the approved plan, the initial clearing must be limited to only that area <br />necessary to gain access to and install the erosion and sediment control devices. <br />S:\5-Erosion Control and Water Quality\Erosion Control and Water Quality\Jobs by year\New Work <br />17\0range\Triple Crown Farms\ COA Triple Crown. docx 4 <br />