Orange County NC Website
57 <br />Margaret Engineering / Erosion 131 W. <br />Control Stormwater Suite 201 <br />♦ s 245-2575 <br />Hillsborough, <br />www.orangecountync.gov <br />ymn <br />Permit Number: EC1 0019 Jurisdiction: Orange <br />Project Name: Triple Crown Farms PIN or TMSL: 9850910030 <br />Permit Date: February y 7, 2017 <br />.1.6 Par°kside Lane 11c is listed as the entity responsible on the Statement of Ownership and <br />Financial Responsibility form submitted for this site. (If you are not the owner /developer or <br />other responsible person, please take this opportunity to correct this error as soon as possible; <br />otherwise, you will be considered responsible.) Although you will probably contract someone <br />(a general contractor, grading contractor, subcontractor, etc.) to actually implement and <br />maintain the erosion control plan, it is your responsibility, according to the Orange County <br />Unified Development Ordinance, to see that the requirements of the Ordinance and approved <br />plan are achieved. It is also your responsibility to ensure the approved plan is successful in <br />containing sediment on -site and that all permanent erosion control measures are successful. If <br />these responsibilities are not fulfilled and enforcement and /or legal actions are taken, it will be <br />against 1.6 'I'a:urgkside Lane LLC, not the grading contractor or other contractor, unless they are <br />the same person or firm. <br />Erosion Control personnel will cooperate with you and your designer and contractor to <br />implement the approved plan and meet the Ordinance requirements. To accomplish this, both <br />you and your agents must take the initiative in contacts with Erosion Control personnel. <br />However, this interaction must not be interpreted as relieving you of any responsibilities and <br />transferring it to the contractor or Erosion Control personnel. Neither should it be construed <br />that Erosion Control personnel are acting as liaison between you and your designer, <br />contractors, or other agents. If problems arise, Erosion Control personnel will suggest solutions; <br />however these are only suggestions, since Erosion Control personnel will not act as your <br />engineer. If necessary you must employ your engineer or architect to design a solution. <br />We will continue to work with you, your contractor, and designer, and we will contact <br />personnel at the site whenever possible to keep the site in compliance (as long as all of you are <br />responsive). If this approach fails, and you do not take the initiative in responding to requests <br />for compliance, you will be given written notices of violation and enforcement action will be <br />taken should you fail to respond by the specified deadlines. It is hoped, and is our commitment, <br />S:\5-Erosion Control and Water Quality \Erosion Control and Water Quality \jobs by year \New Work <br />17\ Orange\ Triple Crown Farms \COA Triple Crown.docx 2 <br />