Browse
Search
Agenda - 04-03-2018 6-a - Major Subdivision Preliminary Plat Application – Triple Crown Farms
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2018
>
Agenda - 04-03-2018 Regular Meeting
>
Agenda - 04-03-2018 6-a - Major Subdivision Preliminary Plat Application – Triple Crown Farms
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2018 3:52:28 PM
Creation date
3/29/2018 3:53:52 PM
Metadata
Fields
Template:
BOCC
Date
4/3/2018
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6-a
Document Relationships
Agenda - 04-03-2018 Regular Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2018\Agenda - 04-03-2018 Regular Meeting
Minutes 04-03-2018
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
22 <br />Patrick R. Mallett <br />From: <br />K4idlae| Harvey <br />Sent <br />Wednesday, February 14,201O1(ll9AK4 <br />To: <br />Peter Bellantoni <br />Cc: <br />Patrick R.K4aUett; Craig Benedict; Chuck Edwards Contact <br />Subject: <br />Triple Crown <br />The purpose of this e-mail is to once again outline what has to happen to address the road issues for the aforementioned project <br />created by the commencement of earth disturbing activity without required permits/approval from NC Department of <br />Transportation (DOT). <br />Per the Resolution of Approval for the project ayapprovedbvLhe0OCC,andbasadontheapp|icant'ssubmkta|ondtheoriginal <br />project engineers design, all roads were to be constructed to applicable NC DOT public road standards with the ultimate goal to <br />have them maintained by DOT once completed and 'petitioned'for acceptance. This was the original proposal (i.e. develop <br />roadways to applicable NC DOT standards) and that ultimately is the 'route' approved by the County. <br />Based on all the information we have available to us the roads/stream crossings DO NOT comply with applicable NC DOT public <br />road standards/requirements as determined by the District Engineer (Copied herein to ensure consistency). <br />Argument as to why is pointless as I have alluded to in separate e-mail conversations. <br />Aam result, the project needstobere'approvedsothenzadvvovscanbenonstructedtotheapp|icab|eCountypriveteroad <br />The County did not create this conundrum and is trying to afford you an opportunity to address. if that opportunity isnot <br />welcomed, then | am not sure what | can do to be of assistance. <br />Further reexamination ofhow we got to this point isa waste nfresources. From n1y standpoint itb clear how vva got here. My <br />suggestion is that you provide the necessary assistance so the project can move forward and be re-approved with roadways <br />developed to the applicable County private road standard. | should mention there are going tobm issues associated with this <br />path given staff has not inspected any of the construction given this was to be built to public road standards as <br />permitted/administered/enforced by DOT. <br />Good morning. <br />Michael D. Harvey A|CP,CFyN,CZO <br />Current Planning Supervisor — Planner III <br />Orange County Planning Department <br />131 West Margaret Lane <br />PO Box 8181 <br />/919\245-2597(phVne) <br />Pursuant to North Carolina General Statute 132, correspondence sent and received from this account is a public record and may <br />be disclosed tothird parties. <br />
The URL can be used to link to this page
Your browser does not support the video tag.