Browse
Search
Agenda 8-e - Major Subdivision Preliminary Plat Application – Morgan Ridge Subdivision
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2018
>
Agenda - 04-03-2018
>
Agenda 8-e - Major Subdivision Preliminary Plat Application – Morgan Ridge Subdivision
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2018 3:53:14 PM
Creation date
3/29/2018 3:35:50 PM
Metadata
Fields
Template:
BOCC
Date
4/3/2018
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8-e
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
We will use headwalls for all 3 crossings to limit the length of stream disturbance. <br />Approximately 0.1 acre (4000sf) of wetlands at the perennial crossing are being <br />affected / disturbed. Retaining walls will be used where the road crosses the <br />wetlands to reduce the impact. There is approximately 13 acres of stream and <br />wetland buffer. That amounts to 25% of the project area. Stormwater will be <br />managed with a stormwater facility on each side of the perennial stream and <br />outside of the stream buffer. Each lot will have individual wells and septic <br />systems. Orange County is reviewing the public road concurrently with the <br />Chatham County review of the subdivision. <br />If you have any questions or comments, please do not hesitate to call or email <br />me. Thank you for your help with this application. <br />Sincerely, <br />Warren D. Mitchell, PE <br />Page 2 <br />W <br />
The URL can be used to link to this page
Your browser does not support the video tag.