Browse
Search
Agenda 8-e - Major Subdivision Preliminary Plat Application – Morgan Ridge Subdivision
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2018
>
Agenda - 04-03-2018
>
Agenda 8-e - Major Subdivision Preliminary Plat Application – Morgan Ridge Subdivision
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2018 3:53:14 PM
Creation date
3/29/2018 3:35:50 PM
Metadata
Fields
Template:
BOCC
Date
4/3/2018
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8-e
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
26 <br />separate easements. That will allow us to leave some trees on the outside of each <br />easement. <br />Recommendation. The Planning Department recommends granting approval of the road <br />name 'Morgan Ridge Way' and granting approval of subdivision First Plat for Morgan <br />Ridge Subdivision with the following conditions: <br />1. The developer must obtain subdivision Concept and Preliminary Plan approval <br />from Orange County prior to submittal of the Construction Plan to Chatham County. <br />2. All septic area encroachments shown within riparian buffer areas shall be removed. <br />3. Stormwater features shall meet all Chatham County Stormwater Ordinance <br />requirements. <br />4. The Construction and Final plats shall show the wetland designated as W -2 on <br />S &EC delineation map. <br />5. The Construction and Final plats shall show the sight triangles on Lots 11 & 12 for <br />future road extension. <br />Page 11 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.