Browse
Search
Agenda 12-5 - Information Item - Memorandum-FY2017-18 Capital Investment Plan Information Updates
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2018
>
Agenda - 04-03-2018
>
Agenda 12-5 - Information Item - Memorandum-FY2017-18 Capital Investment Plan Information Updates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2018 3:52:02 PM
Creation date
3/29/2018 2:22:55 PM
Metadata
Fields
Template:
BOCC
Date
4/3/2018
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
12-5
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br />Roofing and Building Façade Projects: (FY2017-22 CIP page 364-365) This project included flashing <br />repairs for the Whitted Complex. The flashing repairs were completed in winter 2017. This project also included <br />funding for the slate roof replacement at the Skills Development Center (501 Franklin Street, Chapel Hill). The <br />slate roof replacement project design is complete and the construction is anticipated to start in late spring, <br />2018 and anticipated to complete by early summer, 2018. <br /> <br /> <br />Southern Campus Expansion: (FY2017-22 CIP page 367) The Board of County Commissioners awarded a <br />professional services agreement with Smith Sinnett Architecture on November 2, 2017. Both phases of this <br />project are currently in the schematic design phase. Schematic design includes programming, conceptual <br />design, as well as thorough technical review by the Town of Chapel Hill planning staff (as governed by the <br />master plan special use permit). The Board of Orange County Commissioners will review this schematic <br />design in June, 2018. Development design and construction documents for Phase 1(Seymour Center <br />expansion, roadway straightening, and additional Seymour Center parking) are anticipated to be complete in <br />the winter of 2018. Construction of Phase 1 is anticipated to be complete is the late winter, 2020. Phase 2 <br />construction (meeting facility, Health and Dental Clinic, Department of Social Services construction) is <br />anticipated to start and finish approximately nine months behind Phase 1 or in the late fall, 2020. <br /> <br /> <br />These project updates can be found on the Orange County website at <br />http://www.orangecountync.gov/departments/asset_management_services_(ams)/capital_projects.php. <br />If you have any questions please do not hesitate to reach me at 919.245.2628 or at <br />abarnes@orangecountync.gov at any time. <br /> <br /> <br />Thank you. <br /> <br /> <br />Angel Barnes <br />Capital Projects Manager <br />Orange County Asset Management Services <br /> <br />2
The URL can be used to link to this page
Your browser does not support the video tag.