Orange County NC Website
35 <br />Bicycle and Pedestrian Project Scoring Worksheet <br />Project Name: XXXXX <br />Countywide Ranking (choose one of the following — 50 points maximum) <br />0#1 0#2 *# 3 * #d 0#5 unranked <br />30 <br />Safety (choose one of the following — 20 points maximum) <br />Pedestrian project (sidewalks, crosswalks) on roadway with a reported pedestrian- related crash in <br />0 <br />last five years (20 points) <br />Project adds sidewalks on road with 75000 AADT that does not currently have any sidewalks <br />OR project adds sidewalks on road with 710000 AADT that only currently has sidewalk on one side <br />0 <br />OR project adds crosswalks on road with 710000 AADT (20 points) <br />Project adds sidewalks on road with 72500 AADT that does not currently have any sidewalks <br />10 <br />OR project adds sidewalks on road with 75000 AADT that only currently has sidewalk on one side <br />OR project adds crosswalks on road with 75000 AADT (10 points <br />0 <br />On -road bicycle project (bike lanes, wide outside lanes, shared lane markings) on roadway with a <br />0 <br />reported bicycle- related crash in the last five years 20 points) <br />0 <br />On -road bicycle project on road with 720000 AADT <br />0 <br />OR on -road bicycle project that provides parallel route to a road with 720000 AADT (20 points) <br />0 <br />On -road bicycle project on road with 710000 AADT <br />0 <br />OR on -road bicycle project that provides parallel route to a road with 710000 AADT 10 points) <br />Off -road greenway that is available to pedestrians and bicycles and is physically separated from <br />0 <br />roadways (20 points) <br />All other projects (0 points) <br />0 <br />Connectivity (choose one of the following — 10 points maximum) <br />Projects that connect two previously disconnected (or inconveniently connected) sections of bicycle or <br />0 <br />pedestrian infrastructure missin links) 10 points) <br />Projects that connect neighborhoods with schools and /or colleges (10 points) <br />10 <br />* <br />Projects that are located in or provide a connection to a central business district, shopping center, <br />0 <br />ark, hospital, or major employment center (5 points <br />All other projects (0 points) <br />0 <br />Plan Consistency (choose one of the following — 15 points maximum) <br />■ <br />Project is identified in an adopted bicycle or pedestrian plan, or in a CTP (15 points) <br />0 <br />Project is identified in some other type of local plan or document (such as a capital improvement <br />0 <br />!an) (5 mints <br />All other projects (0 points) <br />0 <br />Jurisdictional <br />Collaboration (choose one of the following — 5 points maximum) <br />Project involves collaboration between two or more jurisdictions (5 points) 5 <br />All other projects (0 points) 0 <br />GRAND <br />TOTAL <br />Calculate <br />Lower Section To Be Completed After All Projects Are Scored: <br />Project's TARPO Quantitative Score Ranking within County: <br />Project's TARPO Quantitative Score Ranking within Region: <br />SPOT Points Assigned to this Project by TARPO: <br />Return to Agenda <br />