Orange County NC Website
34 <br />Highway Project Scoring Worksheet <br />Project Name: XXXXX <br />Countywide Ranking (choose one of the following — 100 points maximum) <br />*#1 *#2 0#3 *#A 4111"#5 *#6 0#7 048 *_4'9 0#10 *unranked 60 <br />Congestion (choose one of the following — 10 paints maximum) <br />* <br />Existing volume /capacity ratio greater than or equal to 1.0 (10 points) <br />0 <br />Existing volume /capacity ratio greater than or equal to 0.8 but less than 1.0 (7 points) <br />0 <br />Future projected volume /capacity ratio greater than or equal to 1 .0 (5 points) <br />5 <br />* <br />Future projected volume/capacity ratio greater than or equal to 0.$ but less than 1.0 (3 points) <br />0 <br />* <br />All other projects (0 points) <br />0 <br />Crash History (choose one of the following — 8 points maximum) <br />Location with a high crash severity score (SPOT crash severity score of 100) (8 points) <br />0 <br />* <br />Location with a moderate crash severity score (SPOT crash severity score of 66) (5 points) <br />0 <br />* <br />Crash rate that is more than 1.4 times higher than the state average for similar roadways (equivalent <br />to SPOT crash density score of 100 ) (5 points) <br />0 <br />*i <br />Crash rate that is near or slightly over the state average for similar roadways (equivalent to SPOT <br />crash density score of 66 ) (3 points) <br />3 <br />All other projects (0 points) <br />0 <br />Economic Development (choose one of the following — 5 points maximum) <br />Project that provides direct access to an active industrial/business park development site OR <br />proposed new employment location with more than 200 employees 5 points) <br />0 <br />Project that provides direct access to an existing employment center (one or more employers in close <br />proximity) with more than 200 employees (3 points) <br />0 <br />All other projects (0 points) <br />0 <br />Multimodal Elements (choose one of the following -- 7 points maximum) <br />* <br />Includes facilities/features for all 3 of the following: bicycles, pedestrians, and transit (7 points) <br />0 <br />* <br />Includes facilities/features for 2 of the following. bicycles, pedestrians, and /or transit (5 points) <br />0 <br />Includes facilities/features for i of the following: bicycles, pedestrians, or transit (3 points) <br />3 <br />* <br />All other projects (0 points) <br />0 <br />Jurisdictional Collaboration (choose one of the following — 5 points maximum) <br />* <br />Project involves collaboration between two or more jurisdictions (5 points) <br />0 <br />All other projects (0 points) <br />0 <br />Consistency with Plan (choose one of the following — 15 points maximum) <br />Project comes from an adopted CTP (15 points) <br />15 <br />Project comes from a current draft of a CTP that is in development but not yet adopted (10 points) <br />0 <br />Project comes from an adopted plan other than a CTP (such as a comprehensive plan, land use plan, <br />capital improvement plan, or other locally- adopted document) — THIS ONLY APPLIES IN AREAS THAT <br />DO NOT HAVE A CTP (10 points) <br />0 <br />* <br />GRAND <br />All other projects (0 points) <br />TOTAL <br />0 <br />• <br />Calculate <br />Lower Section To Be Completed After All Projects Are Scored: <br />Project's TARPO Quantitative Score Ranking within County: <br />Project's TARPO Quantitative Score Ranking within Region: <br />SPOT Points Assigned to this Project by TARPO: <br />Return to Agenda <br />