Browse
Search
OUTBoard agenda 121912
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2012
>
OUTBoard agenda 121912
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2018 2:00:23 PM
Creation date
3/26/2018 1:55:50 PM
Metadata
Fields
Template:
BOCC
Date
12/19/2012
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
OUTBoard minutes 121912
(Attachment)
Path:
\Advisory Boards and Commissions - Active\Orange Unified Transportation Board\Minutes\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County & NCDOT Highway <br />Division 7 and District 1 Meeting <br />November 19, 2012 12:00 p.m. <br />27 <br />the sidewalk and efforts could be now be made to get it on the DOT list. Ed <br />Lewis stated that there still might be a cultural review process to be done. <br />Margaret Hauth gave an update on the proposed bus pull -out on Churton Street. <br />She stated that Triangle Transit does not support pull -outs on Churton Street, as <br />bus stop boardings do not meet its threshold criteria and even if built, TTA will <br />not use them. TTA stated that if they pulled off the road into a bus pull -out that <br />they would have a very difficult time getting back into the traffic lane, and their <br />schedule would be delayed. DOT staff concurred that the addition of bus pull- <br />outs to the project would add to project costs and impacts to the adjacent County <br />property. Chair Pelissier offered to inquire further with TTA about their opposition <br />to the bus pull -outs. Mike Mills stated that he felt that the bus pull -outs should be <br />pursued, and if the project was delayed for the completion of a cultural review <br />process that DOT could still get the striping done sooner. Pat Wilson noted that <br />the absence of the bus pull -outs would likely contribute to significant traffic delay <br />on Churton Street, particularly during peak hours. <br />d. Access management plans /policies and regulations for Economic <br />Development Districts (Buckhorn Road, US 70 to West 10 Focus Area) <br />(Craig Benedict) <br />Notes: Craig Benedict, Planning Director, briefly stressed the importance of <br />improved access planning; designated intersections, frontage roads, limited curb <br />cuts, and adequate right -of -way. Craig Benedict also stressed the impacts a <br />development similar to Tanger Outlets can place on an interchange and <br />surrounding transportation network at an interchange such as Buckhorn Road. <br />e. 2012/13 Work Plan: Economic Development and Buckhorn — Mebane Phase <br />2 District Water and Sewer Agreement and Construction (Future Phases) <br />(Craig Benedict) <br />Notes: Craig Benedict, Planning Director, briefly reviewed water and sewer <br />plans in the Buckhorn area and recent BOCC approval of 4- million in <br />infrastructure. The new construction will include three miles of water and three <br />miles of gravity sewer. <br />f. Eno Water and Sewer Project near 1- 85/US70 (Craig Benedict) <br />Notes: Durham and Orange County are conducting a feasibility study of how to <br />serve the Eno EDD with public water and sewer infrastructure. Upon completion <br />of the study, the design may be 6 -7 months out. County Manager, Frank Clifton, <br />stated that Durham staff engineers are taking the lead. We are working directly <br />with NCDOT about the design of 1 -85 /US 70 redesign interchange. <br />0 <br />Return to Agenda <br />
The URL can be used to link to this page
Your browser does not support the video tag.