Browse
Search
OUTBoard agenda 041812
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2012
>
OUTBoard agenda 041812
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2018 1:57:06 PM
Creation date
3/26/2018 1:54:18 PM
Metadata
Fields
Template:
BOCC
Date
4/18/2012
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
OUTBoard minutes 041812
(Attachment)
Path:
\Advisory Boards and Commissions - Active\Orange Unified Transportation Board\Minutes\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D R A F T Attachment 1 <br />2 <br />55 <br />56 <br />57 <br />58 <br />59 <br />60 <br />61 <br />62 <br />63 <br />64 <br />65 <br />66 <br />67 <br />68 <br />69 <br />70 <br />71 <br />72 <br />73 <br />74 <br />75 <br />76 <br />77 <br />78 <br />79 <br />80 <br />81 <br />82 <br />83 <br />84 <br />85 <br />86 <br />87 <br />88 <br />89 <br />90 <br />91 <br />92 <br />93 <br />94 <br />95 <br />96 <br />97 <br />98 <br />99 <br />100 <br />101 <br />102 <br />103 <br />104 <br />105 <br />106 <br />107 <br />108 <br />Tom Altieri: They have four scheduled public hearings per year. When this item last went to the Board of County <br />Commissioners we suggested this particular item, since it is not an ordinance, could go to a regular meeting, they <br />were in agreement. When that public hearing is held, staff will provide the Board of County Commissioners options. <br />They could close the hearing that night and adopt the plan or if there is new information that comes forward at the <br />public hearing, it could be sent back to the OUTBoard or steering committee. I would not want to box in the Board of <br />County Commissioners by saying we are asking them to adopt it the same evening without another option if new <br />information is learned. <br />Nancy Cole Baker: I am apprehensive about what they will say about the pedestrian plan which has drawn lines <br />throughout the County for future trails. Have you heard anything from the Board of County Commissioners on that? <br />Tom Altieri: Nothing specific. This item went to the Board of County Commissioners along with other items on the <br />regular agenda. <br />AGENDA ITEM V: STAFF UPDATES: <br />x Introduction of Darcy Zorio, Orange County Transportation Planner <br />x Active NCDOT Projects in Orange County <br />x State TIP Process – SPOT Prioritization for Rural (TARPO) and Metropolitan (DCHC <br />MPO) Planning Areas <br />x 2040 Long Range Transportation Plan <br />x Burlington Graham MPO <br />x Safe Routes to Schools Action Plan <br />x Congestion Mitigation Air Quality (CMAQ) Projects <br />x Bicycle Safety <br />OUTBoard Action: Receive updates and discuss as appropriate. <br />Tom Altieri reviewed Attachment 2 which was an update on current projects in the County. <br />There was conversation about rumble strips and the cost of resurfacing. Also, the places scheduled for resurfacing. <br />Tom Altieri reviewed the list of projects for Orange County. <br />There was a lengthy discussion about the two foot shoulder and resurfacing after the two foot shoulder is laid. <br />Tom Altieri reviewed the State TIP Process on Attachment 3. <br />Nancy Cole Baker: The bottom line is given the spreadsheets and the way they are now, are there any projects that <br />we think will get funded that will affect our area? <br />Tom Altieri: We don’t have the ability to answer that question now. It will be based on funding and budgets yet to be <br />determined. Projects scoring higher will receive priority. <br />Darcy Zorio: You could look at the state score column. That would be the best indicator but you have to have the <br />other state scores from other MPO projects throughout the state. <br />Nancy Cole Baker: When will we know where our projects rank statewide? <br />Tom Altieri: Staff will need to learn a little more about the process since this is a new process. The MPO is in the <br />initial phases of the 2040 LRTP (Long Range Transportation Plan) process. There is a schedule on page 34. <br />Renee Price: How much of the public actually come to the workshop? <br />2
The URL can be used to link to this page
Your browser does not support the video tag.