Browse
Search
OUTBoard agenda 121813
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2013
>
OUTBoard agenda 121813
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2018 12:15:32 PM
Creation date
3/26/2018 12:14:43 PM
Metadata
Fields
Template:
BOCC
Date
12/18/2013
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
OUTBoard minutes 121813
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange Unified Transportation Board\Minutes\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County & NCDOT Highway Luncheon <br />Division 7 and District 1 <br />October 30, 2013 12:00 p.m. <br />11/07/13 <br /> <br />John M. Link, Jr. Government Services Center <br />Lower Level Meeting Room, 200 South Cameron Street, Hillsborough <br />MEETING NOTES <br />I. INTRODUCTIONS <br />Present: Barry Jacobs, Orange County Commissioner’s Chair; Earl McKee, Orange <br />County Commissioner’s Vice Chair; Tom Stevens, Town of Hillsborough Mayor; <br />Mike Mills, NCDOT Division Engineer; Dawn McPherson, NCDOT Division Traffic <br />Engineer; Ed Lewis, Division Planning Engineer; John Howell, NCDOT Highway <br />Maintenance Engineer; Michael Talbert, Interim County Manager; Craig Benedict, <br />Orange County Planning Director; Margaret Hauth, Town of Hillsborough Planning <br />Director; Tom Altieri, Orange County Comprehensive Planning Supervisor; Bret <br />Martin, Orange County Transportation Planner; Abigaile Pittman, Orange County <br />Land Use/Transportation Planner; Pearl Waite, Orange County OPT <br />II. DISCUSSIONS <br />a. Strategic Mobility Formula and SPOT 3.0 (NCDOT) <br />Mike Mills provided a brief overview of the Strategic Mobility Formula, breakdown <br />of projects into three categories, and distribution of available revenue: statewide <br />(40%), regional (30%) and division level (30%). For additional details: <br />http://www.ncdot.gov/strategictransportationinvestments/ <br />--Divisions will assign their allocation of points to projects that score well through <br />the quantitative process (SPOT 3.0), and the Division recommends RPOs and <br />MPOs take the same approach. <br />--Orange County, MPOs/RPOs, and Division Engineer to coordinate during <br />process of assigning Division points. <br />--Since funds will be even more limited than in the past, the construction costs of <br />projects will be more of a consideration in the Division’s assignment of points. <br />--SPOT 3.0 scores for projects will be available in May 2014. <br />--Ability to share points between MPOs and RPOs when projects cross <br />boundaries. <br />29 <br />ReturntoAgenda
The URL can be used to link to this page
Your browser does not support the video tag.