Browse
Search
OUTBoard agenda 091813
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2013
>
OUTBoard agenda 091813
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2018 12:12:59 PM
Creation date
3/26/2018 12:11:10 PM
Metadata
Fields
Template:
BOCC
Date
9/18/2013
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
OUTBoard minutes 091813
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange Unified Transportation Board\Minutes\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Draft 09-09-2013 <br />2 |Page <br />x Intersection spacing and traffic signal spacing; <br />x Construction of right and left turn lanes; <br />x The development of strategically placed raised medians; <br />x The control of median openings; <br />x Median U-turn treatments or directional crossover to control turning movements <br />x Strategic connectivity to other roadways; <br />x The development of auxiliary lanes such as frontage roads; and <br />x The long-term development of multi-modal options; <br />Eno EDD - Access Management Concept Map and Criteria <br />The Eno EDD – Access Management Concept Map has been prepared utilizing land <br />use, zoning, environmental, transportation data, and evaluating the desired access <br />management strategies for the area. The map provides a concept for future locations <br />and public street connections for properties and streets within the Study Area. The <br />intent of the map is to guide the design of site-access driveways and internal circulation <br />routes for properties located within the management area that are likely to be developed <br />at some point in the future. <br />For those properties that may not be redeveloped by the time the I-85/US-70 <br />interchange is redesigned, the Plan will also be useful for evaluating how access to <br />those sites should continue to be served. Given that development proposals may be <br />years in the future and the details of their layout is unknown, the conceptual access <br />management map focuses on depicting criteria for development of the future <br />transportation network within the Study Area. <br />Accompanying the Eno EDD – Access Management Concept Map is a set of written <br />access management criteria to guide interpretation and implementation of the map. <br />The Map follows the policies on page 25. <br />62
The URL can be used to link to this page
Your browser does not support the video tag.