Browse
Search
OUTBoard agenda 091813
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2013
>
OUTBoard agenda 091813
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2018 12:12:59 PM
Creation date
3/26/2018 12:11:10 PM
Metadata
Fields
Template:
BOCC
Date
9/18/2013
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
OUTBoard minutes 091813
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange Unified Transportation Board\Minutes\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Draft 09-09-2013 <br />1 | Page <br />Eno Economic Development District (EDD) Access Management Plan <br />Introduction <br />The Study Area for the Draft Eno EDD Access Management Plan is the area depicted <br />as Economic Development Transition on the Orange County Future Land Use Map. <br />The Study area contains approximately 980 acres and is primarily bounded by the <br />NCRR /Norfolk Southern (NS) Railway to the south, I-85 to the north, US 70 to the <br />northwest, and properties in the vicinity of Mt. Herman Church Road to the west. The I- <br />85/US 70 interchange is located within the north/central part of the Study Area. The <br />Whispering Pines residential subdivision, comprising approximately 67 acres, is <br />included in the Study Area and is designated as a 10-year Transition Area on the Future <br />Land Use Map. Maps of the Study Area follow on pages 2 and 3. <br />The majority of the area has been designated as an urban growth area since 1981 <br />because of its proximity to I-85, US 70, the interchange of the two, and the <br />NCRR/Norfolk Southern (NS) Railway. <br />The future of the area for urban growth was originally defined by the 1981 Orange <br />County Land Use Plan, and reinforced by the 2030 Comprehensive Plan (2008), and <br />economic development land use and zoning amendments for the majority of the area in <br />1994. Envisioned land uses included non-residential commercial, office and industrial, <br />with some higher density housing. <br />In 2006 the Orange County Board of County Commissioners (BOCC) approved the <br />formation of a citizen Task Force to work with Economic Development and Planning <br />Staff in developing a plan for the Eno EDD. The Eno Economic Development District <br />(EDD) Area Small Area Plan was developed over the next two years as a collaborative <br />effort by community representatives, elected officials, and staff of the Orange County <br />Planning Department, and Durham City/County Planning Department. The Small Area <br />Plan (adopted June 24, 2008; amended February 3, 2009) contains numerous <br />recommendations in the following topic areas: <br />x Water and Sewer <br />x Land Use and Zoning <br />x Transportation <br />x Housing <br />x Parks, Recreation, and Open <br />Space <br />x Communications <br />x Intergovernmental Issues <br />x Other Recommendations, <br />including: <br />o Potential Strategic Growth <br />and Rural Conservation <br />(SGRC Program <br />o Plan Updates <br />o Implementation <br />The analysis within the Eno EDD Small Area Plan explains and supports the importance <br />of this general area for higher intensity activity while preserving environmental and <br />cultural resources of the Eno River to the north and Stoney Creek Basin to the west. <br />39
The URL can be used to link to this page
Your browser does not support the video tag.