Orange County NC Website
For the TARPO project priority list (Attachment 1), all projects that were submitted in 2011 were <br />carried forward to this priority list, and two (2) new projects that were not submitted in 2011 were <br />added to the list and prioritized as the top projects. One of these projects (NC 54 widening) is a <br />completely new highway project not previously submitted that is recommended in the newly <br />adopted Orange County Comprehensive Transportation Plan (OCCTP), which is depicted on the <br />OCCTP Highway Map inAttachment 2.The other project (Efland-Cedar Grove Road <br />improvements), alsodepicted on the OCCTP Highway Map in Attachment 2, was previously <br />submitted for prioritization iterations before 2011 but was removed from that priority list before <br />submission toTARPO and is now being added again for consideration. These two projects were <br />added to the top of the list because they are both OCCTP-recommended projects and are likely to <br />score higher against the State’s prioritization scoring criteria giving them a greater chance of being <br />funded and included in the 2016-2022 STIP. The other four (4) projects were shifted down to <br />priorities 3-6 because they are not likely to score as well for consideration in the 2016-2022 STIP as <br />a result of not having added capacity impacts and not as much of an impact on safety to users as <br />the other two (2) projects. These projects are also recommended on the OCCTP Bicycle Map in <br />Attachment 2.Attachment 3is a map depicting the locations of the draft project priorities for those <br />projects within TARPO’s planning area. <br />For the DCHC MPO project priority list (Attachment 4), all projects that were submitted in 2011 were <br />carried forward to this priority list, and three (3) projects that were not submitted in 2011 were <br />added to the list: NC 54 widening from Neville Road to Old Fayetteville Road, I-40 widening from <br />the I-40/I-85 interchange to the Durham County line, and I-85 widening from the I-40/I-85 <br />interchange to the Durham County line. The NC 54 widening project is a continuation of the <br />recommended NC 54 widening project in the draft TARPO project priority list, while the I-40 and I- <br />85 widening projects were not in previous County priority lists but are projects that have already <br />been included in the STIP and are of statewide significance that will be scored regardless of <br />Orange County’s submission. These two widening projects are likely to score higher than many of <br />the other projects recommended for submission. The general order of suggested project ranking in <br />the DCHC MPO list is: <br />1)Added capacity/mobility projects of local significance; <br />2)Added capacity/mobility projects of statewide/regional significance; <br />3)Transit/rail projects; <br />4)Modernization/bikeway projectsoflocal significance exceeding $1,000,000; and a <br />5)Pedestrian project (the pedestrian project was prioritized last because it would require a 20% <br />local match that the County has not indicated it would provide). <br />The strategy for this ordering of projects will be explained by staff at the OUTBoard’s September <br />18th meeting. Attachment 5is a map depicting the locations of the draft project priorities for those <br />projects within the DCHC MPO planning area. <br />RECOMMENDATION(S): Staff recommends the Board: <br />1)Consider and recommend for approvalthe list of transportation project priorities in the TARPO <br />planning area for the BOCC’s endorsement; and <br />2)Consider andrecommend for approvalthe list of transportation project priorities in the DCHC <br />MPO planning area for the BOCC’s endorsement. <br />20