Browse
Search
OUTBoard agenda 041713
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2013
>
OUTBoard agenda 041713
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2018 12:07:29 PM
Creation date
3/26/2018 12:03:49 PM
Metadata
Fields
Template:
BOCC
Date
4/17/2013
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
OUTBoard minutes 041713
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange Unified Transportation Board\Minutes\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o Early 2014 – Complete Final Design <br />o Early 2014 – Begin Right of Way Acquisition <br />o Early 2015 – Begin Construction <br />6. Comments on Greenbriar Drive improvements. <br />x The proposed plan for Greenbriar Drive shouldinclude turnaround space at the northern <br />and southern ends of the road. <br />x Greenbriar Drive addresses must be changed to meet Orange County emergency <br />response standards. Southern Greenbriar Drive addressescouldpotentially become <br />NC 10 addresses. <br />7. Comments on Byrdsville Road improvements. <br />x The existence of failing septic systems at some mobile homes could make the relocation <br />of the mobile homes difficult. <br />x Abigaile Pittman will check into the reasons for the Jaspers Lane closure. <br />x Orange County requests NCDOT investigate the possible extension of Byrdsville Road <br />near the rail crossing northward along Stony Creek to connect to Workman Road. <br />x The proposed plan for Byrdsville Roadshould include turnaround space where the road <br />ends at the railroad corridor. <br />8. Comments on Gordon Thomas Road improvements. <br />x Coordination with Paschall Road residents will be conducted to determine whether the <br />road will be public or private. NCDOT will conduct investigations to determine if <br />easements are in place or need to be developed to allow access to all residents. <br />x A 30-foot Paschall Road easement may exist.ROAM register of deeds may have <br />information on existing easements using parcel PIN numbers. <br />x Orange County would have to sign a private road maintenance agreement if Paschall <br />Drive remains a private roadway. <br />x Orange County may regulate the number of residences that can have access to a <br />private road. This needs to be investigated further. <br />D. Discussion/Next Steps <br />x Anyrailroad track improvements affecting the NC 10 bridge will be handled as a <br />separate project. <br />x The project team should produce mapping to clearly show project recommendations. <br />x Orange County’s roadway design standards should be investigated by the project team. <br />x The project team will conduct an environmental screening of the Byrdsville Road to <br />Workman Road alignment. <br />74 <br />ReturntoAgenda
The URL can be used to link to this page
Your browser does not support the video tag.