Browse
Search
OUTBoard agenda 022013
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2013
>
OUTBoard agenda 022013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2018 12:02:36 PM
Creation date
3/26/2018 12:01:49 PM
Metadata
Fields
Template:
BOCC
Date
2/20/2013
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
OUTBoard minutes 022013
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange Unified Transportation Board\Minutes\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGENDA <br />Orange Unified Transportation Board <br />February 20, 2013 <br />7:00p.m. <br />You can bring your laptops/tablets if you would like to use them. <br />Hard copies of the agenda packetwill still be mailedfor this meeting. <br />Conference Room 004 (LowerFloor) OrangeCounty West Campus <br />131 West Margaret Lane, Hillsborough <br />Time Item Page Title <br />7:001. <br />2. <br />Call to Order and Roll Call <br />Introduction of guests: Matthew Day, Senior Planner, TARPO; and <br />Scott Walston, PE, NCDOTTransportation Planning Branch <br />7:03 <br />7:04 <br />3. <br />4. <br />3-8 Approval of Minutes <br />Minutes from January 16, 2013 <br />Consideration of Additions to the Agenda <br />7:055. 9-28 Regular Agenda <br />January 24, 2013 Public hearing Draft of Comprehensive Transportation Plan (CTP) <br />http://www.ncdot.gov/doh/preconstruct/tpb/planning/ orangecounty.html <br />x Copy of Draft CTP sent to OUTBoard on 02/06/2013 (please bring this <br />copy to the OUTBoard meeting on 02/20/2013) <br />x Abstractproviding history, background, and intro to CTP <br />x Highway Map and Projects (Attachment 1) <br />x Public Transportation and Rail Map and Projects (Attachment 2) <br />x Bicycle Map and Projects (Attachment 3) <br />x Pedestrian Map and Projects (Attachment 4) <br />x Draft CTP Adoption Map (Attachment 5) <br />x OUTBoard and Staff Draft CTP Comments (Attachment 6) <br />x BOCC CTP Public Hearing Comments (Attachment 7) <br />ADDITIONAL ATTACHMENTS FOR REFERENCE: <br />x Composite CountywideBicycle Map (Attachment 8) <br />x Proposed Orange County Rural Connectivity Pedestrian Plan <br />(Attachment 9) <br />OUTBoard Action:To make a recommendation to the Board of County <br />Commissioners for consideration at its March 7, 2013 meeting. <br />1
The URL can be used to link to this page
Your browser does not support the video tag.