Orange County NC Website
D R A F T <br />engineering work, the project can submit for some of the remaining SAFETEA-LUfunds that have no matching 110 <br />projects. She added that if not, because DOT scored it in their scoring list, it would be eligible for the fundsthat have 111 <br />a 20% match.112 <br />113 <br />Alex Castro asked if the project was in a position to do all of that andhave all the work prepared.114 <br />115 <br />Abigaile Pittman advised that was the goal. 116 <br />117 <br />Motion made by Alex Castro that the OUTBoard recommend to the County Commissioners that they consider 118 <br />approving the 3 SRTS action plans identified for Grady Brown, Stanford Middle School, and Cameron Park 119 <br />Elementary School projects. Seconded by Jeff Charles.120 <br />Vote: Unanimous121 <br />122 <br />123 <br />AGENDA ITEM V:OUTBOARD INPUT FOR COUNTY COMMISSIONERS’ANNUAL PLANNING RETREAT 124 <br />Development of a list of concerns or emerging issues for the upcoming year that the 125 <br />OUTBoard plans to address, or wishes to bring to the Commissioners’’ attention.126 <br />OUTBoard Action:Develop and approve list.127 <br />128 <br />129 <br />Abigaile Pittmanreviewed the staff’s list of 7 items for the report.130 <br />131 <br />Jeff Charles asked if bicycling would fall into #3.132 <br />133 <br />Abigaile Pittman responded it could be under #4.134 <br />135 <br />Jeff Charles noted that bicycling is not mentioned.136 <br />137 <br />Abigaile Pittman confirmed that is it not and suggested that it could be added to the list.138 <br />139 <br />Jeff Charles noted that he has comments about the implementation of bicycling projects during 2013 so they 140 <br />improvements can be made for 2014. He said that there were a number of streets where the OUTBoard was advised 141 <br />there would be 2 foot extensions put in to aid the cycling community and the biggest one was Dairyland which 142 <br />handles a lot of bicycling traffic. He stated that it failed miserably and the cyclist never got 2 feet and some of it is 143 <br />only 6 inches. He stressed that the implementation was a failure and further that Orange Grove Road where NCDOT 144 <br />went back and redid it and there is a line in it, that section of the pavement is now heaving and separating from the 145 <br />main road because there is not a top surface. He said that bicycling is getting a C in implementation in Orange 146 <br />County and they are spending money but no one is overseeing the projects appropriately and he thinks it has been a 147 <br />failure for the amount of money that has been spent. Jeff thinks the OUTBoard should go on record to state that 148 <br />there needs to be a bicycling coordinator at the staff level in Orange County to oversee these projects because DOT 149 <br />is not doing a good job. He said that he cannot state that strongly enough and the damage being done by the 150 <br />infrastructural changes is now causing significant damage to the roads that are hazardous to cycling. He added that 151 <br />bicycling is taking a back seat and it is time for Orange County to step up.152 <br />153 <br />Abigaile Pittman advised that this is an emerging issues list so it is about what the OUTBoard needs to be looking at 154 <br />in 2014.155 <br />156 <br />Jeff Charles responded that the OUTBoard needs to recommend better bicycle coordination infrastructural changes. 157 <br />158 <br />Ted Triebel noted that the key is to have somebody that would monitor what is going on and it would become part of 159 <br />somebody’s job description.160 <br />161 <br />Jeff Charles noted that Dale has that responsibility in Durham and asked who has that responsibility in Orange 162 <br />County.163 <br />164 <br />4