Browse
Search
OUTBoard agenda 021914
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2014
>
OUTBoard agenda 021914
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2018 11:35:39 AM
Creation date
3/26/2018 11:34:43 AM
Metadata
Fields
Template:
BOCC
Date
2/19/2014
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
OUTBoard minutes 021914
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange Unified Transportation Board\Minutes\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OPT5-Year Bus Service Expansion Recommendation Notes <br />1)Northeastern and Northwestern County Zonal Routes – Route would come online July 2014, would <br />be one day per week on a Tuesday or Thursday running 5 hours per day with one-hour headways <br />during off-peak periods, and would run a deviated fixed-route schedule. This route would require <br />0.50 bus and could be run using an LTV spare. The route would connect residents in northeastern <br />Orange County to destinations and additional transit connections in Hillsborough.The route would <br />be fare-free. <br />2)US 70 Midday Service – Route would come online January 2015, would be a daily weekday <br />service running up to 6 hours per day during off-peak periods with two-hour headwaysper <br />direction, and would run a fixed-route schedule. This route would require 1 additional bus(Section <br />5307-funded). The route would connect Mebane/Buckhorn and Efland with destinations and <br />additional transit connections in Hillsborough and Durham. The route would be fare-free. <br />3)Route 420 Expansion – Route would come online January 2015, would be a daily weekday service <br />running up to an additional 10 hours per day (5 hours each northbound and southbound) with one- <br />hour headways, and would run a fixed-route schedule. This assumes a two-hour run time each <br />way. This route expansion would require 2additional buses(Section 5307-funded). The route <br />would connect Cedar Grove with destinations and additional transit connections in Hillsborough <br />and would continue on to destinations and additional transit connections in Chapel Hill.The route <br />would be fare-free. <br />4)Hillsborough Circulator with Additional Noon Hour Service – Route would begin using OPT <br />OCBRIP funding July 2015 and would continue the existing Hillsborough Circulator service with an <br />additional hour added for 12pm-1pm. Route would not require any additional buses but would <br />require 2 replacements(Section 5307-funded)for 2 existing ARRA-funded buses.The route would <br />continue to be fare-free. <br />5)Later Senior Center Service – Route would come online July 2016, would be a daily weekday <br />service running up to 4.5 hours per day with one-hour headways, and would run a deviated fixed <br />route or point deviated demand response schedule. The route would provide earlier and later <br />service to and from Orange County senior centers beyond times the service is currently provided. <br />Service may require 1 additional bus. <br />UNFUNDED PRIORITIES: <br />6)Expansion of Route 420 Peak Service to Cedar Grove <br />7)Hillsborough Circulator Service Additions to include weekend service and/or early morning and <br />evening service <br />8)EDTAP/RGP Subsidization – Funds could be used to subsidize $3 copays for EDTAP trips already <br />provided by OPT to make medical trips free for users.Funds could also be used to provide limited, <br />free or fare-reduced rural general public point deviated demand response service to persons <br />throughout the county who are pre-qualified for other human service-specific transportation within <br />the county. This service expansion could be funded with any additional funding realized by OPT <br />through additional OCBRIP revenues or leveraged federal or state grant sources or it could be <br />considered a higher prioritythan expanded senior center service and supplant that service <br />recommendation. <br />9)Others???? <br />Attachment 3 23
The URL can be used to link to this page
Your browser does not support the video tag.