Orange County NC Website
Following this, the MPOs and RPOs rank projects at the Division Needs level, which can include <br />projects that were not funded at the Statewide or Regional levels. NCDOT SPOT then finalizes <br />Division Needs project scores, and the TIP staff identifies Division Needs projects for the draft <br />STIP incorporating these division level projects. <br />NCDOT releases the draft STIP reflecting successfully scored Statewide Mobility, Regional <br />Impact, and Division Needs transportation projects in the Winter of 2016. Following this the <br />North Carolina Board of Transportation (NC BOT) approves the final 2018-2027 STIP (with all <br />three levels of projects) in the Summer of 2017. The next cycle then starts over again in the Fall <br />of 2017. <br />RECOMMENDATION(S): Staff recommends the OUTBoard receive the update on the STIP <br />development process. Since this item has not been referred by the County Commissioners for <br />review, no further action is required. <br />50