Browse
Search
OUTBoard agenda 031616
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2016
>
OUTBoard agenda 031616
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2018 10:47:37 AM
Creation date
3/26/2018 10:46:46 AM
Metadata
Fields
Template:
BOCC
Date
3/16/2016
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
OUTBoard minutes 031616
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange Unified Transportation Board\Minutes\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Buckhorn Road/Orange Grove Road, and Old Greensboro Road.The TARPO/Orange <br />County project list and associated map is provided in Attachment 4.NCDOT is currently in <br />the process of scoring each of these projects, and quantitative project scores are <br />anticipated from NCDOT this month. The process will then continue as previously <br />described. <br />TARPO Combined Project List (Carry-Over from SPOT 3.0 and New) <br />Carry-Over Projects: <br />Map ID Project <br />1 NC 54 widening from Orange Grove Road to NC 119 in Alamance County <br />2 NC 54 widening from Old Fayetteville Road to Orange Grove Road OR just operational <br />improvements* <br />3 Intersection Improvements at NC 54 and Old Fayetteville Road (DCHC MPO planning area)* <br />4 Intersection Improvements at NC 54 and Dodsons Crossroads* <br />5 Intersection Improvements at NC 54 and Orange Grove Road* <br />*The NC 54 widening project from Old Fayetteville Road to Orange Grove Road is being split into multiple <br />segments in cooperation between NCDOT Division 7 staff, which favored keeping the project as an <br />added capacity project (as it was shown in the past) and the Town of Carrboro, which favored changing <br />the project to one involving only operational improvements. This allows TARPO to consider both potential <br />options and see how each scores to determine competitiveness for funding. <br />New Projects: <br />Map ID Project <br />6 Efland-Cedar Grove Road modernization project (Highland Farm Road to NC 86. Termini <br />was previously north of Carr Store Road) <br />7 Old Greensboro Road modernization project (Jones Ferry Road to NC 87 in Alamance <br />County line. Termini was previously the Alamance County line.) <br />8 Orange Grove Road/Buckhorn Road modernization project (Dairyland Road to West Ten <br />Road) <br />Projects Endorsed by BOCC at June 2, 2015, meeting that were not be submitted by <br />TARPO for scoring: <br />x Orange Grove Road Paved Shoulders (From NC 54 to Arthur Minnis Road) <br />x Dairyland Road Paved Shoulders <br />x Orange Grove Road/Dodsons Crossroads Paved Shoulders <br />These projects were not recommended by the TARPO Prioritization subcommittee because <br />they are categorized as bicycle infrastructure projects that would require the County to <br />provide a 20% local match and to administer the implementation of the project <br />RECOMMENDATION(S): Receive and review. <br />19
The URL can be used to link to this page
Your browser does not support the video tag.