Orange County NC Website
of traffic backing up on the northbound exit ramps of I-40/I-85 onto southbound Buckhorn Road and at a <br />left turn into a nonconforming business use just south of the interchange. Orange County has extended <br />water and sewer to this area to serve public facilities and to increase the attractiveness of the EDD for <br />development. The project was previously submitted through the DCHC MPO as a bike project requesting <br />four (4)-foot paved bike lanes when Buckhorn Road was located within that MPO’s planning area. <br />**Construct new interchange at existing grade-separated crossing of Mattress Factory Road and I-40/I- <br />85 to relieve existing and/or future expected congestion on projected under-capacity existing <br />interchanges at I-40/I-85 and Mebane Oaks Road and I-40/I-85 and Buckhorn Road and to serve existing <br />and future growth in the specific area around the proposed interchange. The proposed interchange would <br />address both traffic capacity deficiencies and reduce crashes related to congestion on parallel <br />thoroughfares. The new interchange would also be an opportunity to provide pedestrian and biking <br />facilities across I-40/I-85 that do not currently exist in the Mebane area. <br />Specific improvements associated with the interchange include: <br />x Modified diamond interchange with a loop ramp in the southeast quadrant for I-40 eastbound <br />exiting vehicles; <br />x Five (5)-lane roadway section on Mattress Factory Road at the proposed interchange; <br />x One bridge structure with a five (5)-lane section and bike/ped accommodations; <br />x Traffic signals installed on Mattress Factory Road at the ramp intersection and Oakwood Street <br />with coordinated signals; and <br />x Industrial Drive realignment to intersect Mattress factory Road either across from Oakwood Street <br />or further north. <br />New Projects: None <br />Projects Endorsed by BOCC at June 2, 2015, meeting that were not be submitted by <br />B-G MPO for scoring: <br />x Mattress Factory Road extension to U.S. 70 – The extension of Mattress Factory <br />Road northward a distance of approximately 240 feet across East Washington <br />Street and the NCRR/Norfolk Southern railroad right-of-way to intersect U.S. 70 <br />at a 90 degree angle. The project would also call for the closure of the existing <br />railroad crossover road connecting East Washington Street and U.S. 70 <br />approximately 240 feet to the east that currently provides access across the <br />railroad right-of-way to U.S. 70. <br />This project was not recommended by the B-G MPO TAC because of its low score under <br />SPOT 3.0. <br />TARPO Projects <br />Under the TARPO process each county may submit a single ranked list of up to the top ten <br />(10) projects in all modes, and public input must be solicited. TARPO will then perform a <br />quantitative analysis to rank all of the projects, ultimately determining the final priority <br />ranking for submission to the SPOT P4.0 process, along with the list of carry-over project <br />from SPOT 3.0. The project list seen and recommended by the OUTBoard and BOCC last <br />year (May and June, 2015) originally had nine (9) projects. Through the TARPO review <br />process, this list was reduced to eight (8) projects, with five (5) of the projects being <br />segments of NC 54. The other three (3) projects relate to Efland-Cedar Grove Road, <br />18