Orange County NC Website
<br /> <br /> <br /> Staff reviews previous project submissions and prepares a draft list of projects for <br />consideration through the process. Since the process is repeated every two years, <br />the lists submitted to each MPO/RPO will often be similar to lists from previous <br />years. <br /> This preliminary project list is presented to the Orange Unified Transportation Board <br />(OUTBoard) for consideration and approval. <br /> The OUTBoard forwards a project list for all MPOs and RPOs in Orange County to <br />the BOCC for approval. The BOCC approves the list as the preliminary list for further <br />consideration and coordination at the MPO and RPO level. <br /> <br />The timing of project submissions is determined by the MPOs/RPOs, as well as NCDOT. <br />For reference, NCDOT’s Draft Project Prioritization Schedule for the SPOT 5.0 process is <br />provided in Attachment 1. <br /> <br />RECOMMENDATION: The staff recommends the OUTBoard: <br /> <br />1. Receive information on this update and provide any comments that the Board might <br />have. <br /> <br /> 52