Browse
Search
OUTBoard agenda 092017
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2017
>
OUTBoard agenda 092017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2018 10:28:21 AM
Creation date
3/26/2018 10:27:03 AM
Metadata
Fields
Template:
BOCC
Date
9/20/2017
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
OUTBoard minutes 092117
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange Unified Transportation Board\Minutes\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />MPO Next Steps <br />The Alternatives Analysis has been released for public comment. Over the next few months, <br />the DCHC MPO Board will use comments collected from the public and local governments to <br />direct the development of a Preferred Option. The Preferred Option is the Draft 2045 MTP <br />which will be released in October 2017. The final 2045 MTP is scheduled to be adopted by the <br />MPO Board December 2017. <br /> <br />Attachment 2 provides the full schedule of MTP Local Input meetings on the Alternatives <br />Analysis. <br /> <br />OUTBoard Action <br />Staff is seeking local government comments, which at this stage are typically general in nature. <br />Attachment 3 was submitted to the BOCC by the OUTBoard in 2012, as part of the 2040 MTP <br />Alternatives Analysis process. The OUTBoard may choose to use its 2012 comments and <br />update as necessary to forward to the BOCC. <br /> <br />Attachment 4 is a list of Orange County (incl. municipal) major highway projects in the <br />Alternatives Analysis. Any specific comments on the list are also welcome at this time and may <br />assist with the selection of highway projects to be included in the Preferred Option (draft 2045 <br />Plan). The projects shown with gray shading have been identified by staff as least likely to be <br />included in the draft 2045 Plan. Transit, bicycle and pedestrian project lists are not yet available <br />from the MPO. However, it is expected that the Orange County transit projects will be taken <br />from the Orange County Transit Plan (2017). <br /> <br />FINANCIAL IMPACT: There is no immediate financial impact associated with this item. <br /> <br />RECOMMENDATION(S): Staff recommends that the OUTBoard: <br /> <br />1. Receive the presentation; <br />2. Discuss as appropriate; and <br />3. Identify any comments the Board may have for staff to convey to the Board of County <br />Commissioners. <br /> 24
The URL can be used to link to this page
Your browser does not support the video tag.