Orange County NC Website
TIP/WBS # Description Let/Start <br />Date <br />Completion <br />Date Cost Status <br />NCDOT PROJECTS LOCATED IN BGUMPO - UNDER DEVELOPMENT <br />46944 Realign SR 1151 (Troxler Rd) approximately 100 ft. south to <br />improve the intersection with NC62 in Burlington <br />4/10/17 6/30/17 $140,000 Construction underway - 100% <br />complete <br />47292 Installation of crosswalks and pedestrian signals and update <br />curb ramps at the intersection of NC-119, SR 1007 (Mebane <br />Oaks Rd) and Falcon Ln (non-system) in Mebane <br />Summer <br />2017 <br />Fall 2017 $80,000 Signal design pending, Traffic to <br />coordinate curb ramp improvements <br />with Maintenance <br />37