Browse
Search
OUTBoard agenda 081617
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2017
>
OUTBoard agenda 081617
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2018 10:26:54 AM
Creation date
3/26/2018 10:26:04 AM
Metadata
Fields
Template:
BOCC
Date
8/16/2017
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
OUTBoard minutes 081617
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange Unified Transportation Board\Minutes\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TIP/WBS # Description Let/Start <br />Date <br />Completion <br />Date Cost Status <br />B-5239 <br />42841.3.2 <br />Replace Bridge #126 on NC87 over Mill Race and Bridge <br />#119 over Haw River <br />12/19/17 FY2019 $5,930,250 R/W acquisition complete <br />B-5735 <br />45691.3.1 <br />Replace Bridge #307 over Back Creek on SR 1936 (Stone <br />Street Extension) <br />3/15/18 FY2019 $1,900,000 R/W acquisition - 25% complete <br />R-5787B <br />44917.3.3 <br />Curb ramp improvements at various intersections in Orange <br />and Alamance Co. <br />7/6/17 Fall 2017 $798,540 Project awarded to Atlantic <br />Contracting Company, Inc. <br />ER-2971 <br />3607.3.08 <br />Install widening, curb and gutter, and construct sidewalk on <br />NC 49 (Main St.) between the east side of the Haw River <br />Bridge and Stone St. in Haw River <br />1/27/16 5/1/17 $275,000 Under construction - 95% complete, <br />additional work and punchlist items <br />pending <br />ER-2971 <br />3607.1.16 <br />3607.3.16 <br />Construct sidewalk on the east side of SR1716 (N. Graham <br />Hopedale Rd) between Wilkins St. and North Ashland Drive in <br />Burlington <br />Fall 2017 Fall 2017 $70,000 Final PS&E pending from the City <br />I-5711 <br />50401.2.1 <br />50401.3.1 <br />Interchange improvements at I-40/I-85 and SR 1007 (Mebane <br />Oaks Rd) in Mebane <br />6/18/19 FY2022 $17,446,000 Planning and design activities <br />underway <br />I-5954 <br />45907.1.1 <br />45907.3.1 <br />Pavement Rehabilitation on I-40/I-85 from east of NC54 in <br />Alamance Co. to west of SR 1114 (Buckhorn Rd) in Orange <br />Co. <br />7/18/17 11/15/18 $10,885,000 Project awarded to APAC-Atlantic, <br />Thompson-Arthur Division <br />I-5956 45909.1.1 <br />45909.3.1 <br />Pavement Rehabilitation on I-40/I-85 from east of SR 3056 <br />(Rock Creek Dairy Road) in Guilford Co. to west of SR 1226 <br />(University Drive) in Alamance Co. <br />7/18/17 11/15/18 $4,500,000 Project awarded to APAC-Atlantic, <br />Thompson-Arthur Division <br />SS-4907BQ <br />44757.1.1 <br />44757.2.1 <br />44757.3.1 <br />Intersection improvements (All Way Stop) at SR 1005 <br />(Greensboro-Chapel Hill Road) at SR 2369 (Sylvan <br />School Road) and SR 2371 (Pleasant Hill Road) in Snow <br />Camp. <br />Aug. 2017 Sept. 2017 $22,500 R/W <br />$153,000 CON <br />Planning and design activities <br />underway, 4-way stop installation <br />August 2017 <br />NCDOT PROJECTS LOCATED IN BGUMPO - UNDER DEVELOPMENT <br />36
The URL can be used to link to this page
Your browser does not support the video tag.