Orange County NC Website
TIP/WBS # Description Let/Start <br />Date <br />Completion <br />Date Cost Status <br />NCDOT PROJECTS LOCATED IN BGUMPO - UNDER DEVELOPMENT <br />SS-4907BS <br />44894.1.1 <br />44894.2.1 <br />44894.3.1 <br />Installation of traffic signal at the intersection of US70 and SR <br />1114 (Buckhorn Road) East of Mebane. <br />Aug. 2017 Oct. 2017 $40,500 R/W <br />$43,200 CON <br />Signal design complete, R/W <br />acquisition complete and certified, <br />utility relocations pending <br />U-3109B <br />34900.2.3 <br />34900.3.FR3 <br />NC119 Relocation from north of SR 1921 (Mebane Rogers <br />Road) to south of SR 1918 (Mrs. White Road) in Mebane <br />7/17/18 FY2020 $17,813,000 Planning and design activities <br />underway, R/W acquisition begins <br />8/18/17 <br />U-5538C <br />44113.3.4 <br />Construct left turn lanes on all approaches at the intersection <br />of SR 1981 (Trollingwood-Hawfields Rd) and NC 119 in <br />Mebane <br />Jun. 2017 Aug. 2017 $700,000 R/W acquisition and utility relocation <br />underway, under construction - 50% <br />complete <br />U-5752 <br />51077.2.1 <br />51077.3.1 <br />Intersection improvements at US 70 (South Church Street) <br />and St. Marks Church Road in Burlington <br />6/30/18 FY2019 $935,000 Planning and design activities <br />underway, R/W acquisition <br />underway <br />U-5843 <br />50233.2.1 <br />50233.3.1 <br />Intersection improvements at US 70 (South Church Street) <br />and SR 1817 (Graham-Hopedale Road) in Burlington <br />6/30/18 FY2019 $1,163,000 Planning and design activities <br />underway, R/W acquisition <br />underway <br />U-5844 <br />50234.2.1 <br />50234.3.1 <br />Construct multi-lanes on NC62 from SR 1430 (Ramada <br />Road) to US 70 (South Church Street) in Burlington <br />4/16/19 FY2021 $7,100,000 Planning and design activities <br />underway, R/W acquisition <br />scheduled for 1/16/18 <br />W-5707D <br />44853.1.4 <br />44853.2.4 <br />44853.3.4 <br />Safety improvements for curve on NC 49 located between <br />Buckingham Mountain Road (non-system) and SR 2363 <br />(Beale Road) in Snow Camp. <br />7/5/18 FY2019 $200,000 R/W <br />$450,000 CON <br />Planning and design activities <br />underway <br />44450 Construct right turn lane, extend existing left turn lane and <br />signal modification at the intersection of Forestdale Dr.(non- <br />system) at US 70 (S. Church St.) in Burlington <br />7/10/17 Dec. 2017 $143,000 R/W certified, Re-bid open 7/10/17, <br />concurrence in award pending <br />35