Orange County NC Website
TIP/WBS # Description Let/Start <br />Date <br />Completion <br />Date Cost Status <br />NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT <br />W-5707A <br />44853.1.1 <br />Curb ramp improvements at the following intersections: SR <br />2048 (South Road) at Raleigh Street; SR 2048 (South Road) <br />at Country Club Road, SR 1902 (Manning Drive) at Paul <br />Hardin Drive, and SR 1902 (Manning Drive) at Ridge Road / <br />Skipper Bowles Road in Chapel Hill <br />6/15/2017 Aug. 2017 $80,000 Planning and design activities <br />underway. Signal pedestrian <br />improvements complete. <br />47418 Install chain link fence on both sides of SR1006 (Orange <br />Grove Rd.) bridge over I-40 in Orange Co. <br />Oct. 2017 Dec. 2017 $100,000 Project development underway, <br />Tentative construction schedule <br />pending design <br />34